Similar Projects
Rice Lakes Aquatics & Recreation Center
New Construction, Infrastructure
Design
$11,000,000 to $13,000,000 est. value
Rice Lake, WI 54868

Falls At Pike Creek Clubhouse
New Construction - 7,997 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Kenosha, WI 53142

Site-Outdoors-Swimming Dock
Alteration
Results
Elkhart Lake, WI 53020

Goodman Community Pool Resurfacing
Post-Bid
Madison, WI 53704

2022 Stevens Point Municipal Pool Replaster
Alteration
Post-Bid
Stevens Point, WI 54481

Lacrosse/Onalaska YMCA (RW Houser) - New Warm Pool
New Construction, Infrastructure
Post-Bid
Onalaska, WI 54650

Fond du Lac Pool Liner Installation
Results
Fond du Lac, WI 54935

Whitnall Pointe Apartments
New Construction, Renovation, Addition, Demolition
Design
$1,052,726 est. value
Franklin, WI 53132

2021 Donald Copps Municipal Pool Facility Waterslide Rehabilitation
Results
Stevens Point, WI 54481

Reported 05/20/2022 03:26 PM
Project Title

Fairgrounds Pool Water Heater Replacement

Physical Address View project details and contacts
City, State (County) Fond du Lac, WI 54935   (Fond du Lac County)
Category(s) Entertainment/Recreation
Sub-Category(s) Swimming Pool(s)
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Renovation of a swimming pool in Fond du Lac, Wisconsin. Completed plans call for the renovation of a swimming pool. The project quantities includes but are not limited to the following described approximate quantities of work: SCOPE OF WORK o Demo existing Bock water heater and remove o Supply and install two Phoenix PHM (OR EQUIVALENT) 100 gallon water heaters, sealed combustion, stainless steel tank water heaters with a first hour recovery of 670 gallons, IPEX PVC common intake and exhaust venting, condensate assemblies and thermal expansion tanks. o Domestic water pipe material - copper type "M" hard tubing with sweat solder fittings and full port ball valves. o All necessary plumbing, gas, vent, and piping to be installed per Wisconsin plumbing code ALTERNATE NO. 1 o Remove the existing Powers mixing valve and dispose of. o One (1) EVT Platinum Plus electronic tempering valve with NEMA 1 enclosure with digitaldisplay, stainless steel valve body and accessories. No bid shall be withdrawn for a period of (30) thirty days after the opening of said bids, without the consent of the Deputy Procurement Officer. The City of Fond du Lac may reject any or all bids on any basis and without disclosure of any reason. The failure to make a disclosure shall not result in accrual of any right, claim or cause of action against the City. The City also reserves the right to waive any formalities or informalities in bidding, and to select the bid that, in its opinion, will best serve the interests of the City.

Details

Division 13 - Special Construction.
Division 22 - Plumbing.
Division 42 - Process Heating, Cooling, and Drying Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents