Similar Projects
Police Department HVAC System Replacement
Bidding
Telford, PA 18969

Loller Building Improvements
Bidding
Hatboro, PA 19040

Construction Project, CSS# 9773 - HVAC Repairs (PA206)
Post-Bid
$25,000 to $100,000 est. value
Willow Grove, PA 19090

Addition and Renovations to Eagleville Elementary School - HVAC Construction
Post-Bid
Less than $2,720,000 est. value
Eagleville, PA 19403

Ludington Public Library Window, Lighting, and HVAC Improvements - General Construction
Results
$450,000 to $500,000 est. value
Bryn Mawr, PA 19010

2020 High School Woodshop Conversion Project - HVAC Construction
Results
Eagleville, PA 19403

HVAC and Mechanical Products
Term Contract
Post-Bid

Replacement Chillers at Bridgeport And Candlebrook
Results
$500,000 est. value
Bridgeport, PA 19405

Chiller Replacements at the Gwynedd Square Elementary School
Results
Lansdale, PA 19446

Library HVAC Alterations at Pennbrook Middle School
Results
North Wales, PA 19454

Norristown Wastewater Treatment Plant Phase I Improvements Project - HVAC Construction
Results
Norristown, PA 19401

Simmons Elementary School Cooling Tower Replacement
Results
$300,000 est. value
Horsham, PA 19044

Youth Center HVAC Cooling Tower and Building Automation Project
Results
Norristown, PA 19403

HVAC Replacement Project
Results
Montgomeryville, PA 18936

Arrowhead Elementary School - HVAC Construction
Results
Less than $3,548,850 est. value
Eagleville, PA 19403

Last Updated 09/25/2020 12:33 PM
Project Title

Municipal Hall Renovations - HVAC Construction

Physical Address View project details and contacts
City, State (County) Norristown, PA 19401   (Montgomery County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $750,000 to $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Extensive renovation of the existing 4 story (with basement) 38,893 SF steel framed and masonry, construction type 2B building of same use into a 46,395 SF facility. 2. A 562 SF (footprint) Four-story steel and concrete addition clad in masonry and aluminum window wall, to be used primarily for vertical circulation and added administrative space. The addition will feature a stair tower, elevator shaft and topped with a membrane roofing system over tapered insulation. 3. A 2,648 SF one-story masonry and concrete addition to house the detention area and drive-in sally Porte of the renovated Police facility. 4. Renovation of existing 4,635 SF Basement level from Police related, back-of-house functions into long term storage and mechanical space, including a limited use elevator system to assist in the secure movement of materials. 5. Complete renovation of existing Ground level Police facility, including locker rooms, evidence and equipment storage as well as administrative spaces. This will include the extension of an existing stair tower down, into and through the Ground floor space to basement below. 6. Complete renovation of existing First floor Municipal Hall, including a Public Police lobby and administrative offices and a shrunken Council Chambers. 7. Complete renovation of existing Second floor Municipal administrative offices to similar function including the partial floor infill of the existing double-high Council Chamber space. 8. Conversion of the Third-floor space into administrative office area, including the erection of two thruroof dormers. This will include the extension of an existing stair tower up and into the third-floor space. 9. Existing slate tile roofing will be removed and replaced with a synthetic shingle system. New addition roofs will receive a membrane system. 10. Complete window systems replacement and partial renovation of existing facades. 11. The project includes a complete systems replacement and redistribution within the existing services footprint of the building, including electrical, mechanical, plumbing and sprinkler. 12. Site work will consist of all public spaces immediately surrounding the building as well as a reconfiguration of the existing parking lot and all associated lighting. Included in site work is: excavation, regrading and reconfiguration of parking, site lighting, stormwater management, plantings, curbs, paving, pavers, walks and site furniture.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents