Similar Projects
Willowbrook Industrial
New Construction - 130,540 SF
Pending Verification
$10,000,000 CJ est. value
Spanish Fork, UT 84660

Ultradent Building 4
New Construction - 167,883 SF
Design
$10,000,000 CJ est. value
South Jordan, UT 84095

S&S Industrial Park Building 2
New Construction - 42,000 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Lehi, UT 84043

KW Distribution Center
New Construction - 221,064 SF
Pending Verification
$10,000,000 CJ est. value
Logan, UT 84321

7th At Geneva Road
New Construction - 33,000 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Lindon, UT 84042

Summit Commerce Center
New Construction - 253,825 SF
Pending Verification
$10,000,000 CJ est. value
Draper, UT 84020

4Live Manufacturing
New Construction - 88,520 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Vineyard, UT 84058

Beehive Industrial
New Construction - 40,117 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Saint George, UT 84790

Lewis Landing
New Construction
Pending Verification
$10,000,000 CJ est. value
Lehi, UT

The Remodel of Two Warehouses
Post-Bid
Less than $4,250,000 est. value
UT

Reported 02/01/2022 10:51 AM
Project Title

Rush Creek Industrial

Physical Address View project details and contacts
City, State (County) Eagle Mountain, UT   (Utah County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse
Contracting Method
Project Status Obtained from a Public Office
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

15 Industrial Warehouse, New Construction, 80 Acres.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Windows.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Fire Protection Specialties.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents