Similar Projects
York Elementary School HVAC Upgrades Project
Alteration
Bidding
$900,000 est. value
Vancouver, WA 98682

ESH-EL-WL-HVAC Compliance and Monitoring
Alteration
Bidding
$1,070,555 to $1,183,245 est. value
Medical Lake, WA 99022

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

North Franklin School District Connell High School HVAC Replacements
Alteration
Results
Connell, Pasco, WA 99326

51st Circle HVAC Purchase and Installation
Alteration
Results
Vancouver, WA 98661

Evergreen High School HVAC Upgrades
Alteration
Bidding
$350,000 est. value
Vancouver, WA 98684

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Clallam County Courthouse VAV Replacement Project
Alteration
Results
$330,000 est. value
Port Angeles, WA 98362

Whittier Elementary School Boiler Replacement
Alteration
Bidding
Everett, WA 98213

HVAC and Air Filtration Systems
Renovation, Alteration
Post-Bid
Sunnyside, WA

PPWWTF Solids Drying Heat Exchanger Repairs
Alteration
Results
$200,000 to $250,000 est. value
Edmonds, WA 98020

Union High School HVAC Upgrades
Alteration
Bidding
$350,000 est. value
Camas, Vancouver, WA 98682

City Hall HVAC Monitoring
Alteration
Post-Bid
$28,840 est. value
Sammamish, WA 98075

Headquarters Diesel Exhaust Removal System
Alteration
Results
$92,500 est. value
Belfair, WA 98528

Last Updated 02/09/2022 10:51 AM
Project Title

Maintenance Building HVAC Replacement

Physical Address View project details and contacts
City, State (County) Richland, WA 99352   (Benton County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $895,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Works includes General, Architectural, Mechanical, Electrical and other work. 1. Architectural: a. Removal and replacement of existing mezzanine single-leaf door with new double leaf hollow metal door, frame, and hardware. Associated repair and refinishing of adjacent wall. 2. Mechanical: a. Heating and ventilation provided by new HVU’s installed inside the existing mezzanine mechanical space. Two central natural gas-fired make-up air units capable of 5000 cfm and 4000 cfm maximum with 350 MBH natural gas input to pre-condition outside air and vary the volume of outside air based on the number of operating exhaust hose reels in the repair bays, disconnecting ventilation from space heating. Minimum airflow through each unit of 1000 cfm. General space exhaust. Ducts to distribute the air to the repair bays and only treat ventilation and make-up air requirements. Natural gas-fired infrared heaters installed between repair bays. b. The Facility Maintenance Shop will require a unit with 1700 cfm of airflow capacity and 120 MBH natural gas input and be equipped with cooling. c. Existing systems to provide heating and cooling for back-of-house spaces, such as Break Room, Parts Room, and Locker Rooms. 3. Plumbing: a. Copper tubing condensate drainage system serving condensate-producing new HVAC equipment. b. Natural gas piping from existing mains to new gas-fired HVAC equipment. 4. Electrical: a. Electrical panels, circuits, conduit, devices, conductors, disconnects, etc. as requiredto service new HVAC equipment.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents