Similar Projects
Envelope Improvements for Stanford L Warren Library Building
Alteration
Bidding
Durham, NC 27707

Thalian Hall Interior Repairs
Alteration
Bidding
Wilmington, NC

Rockingham Youth Development - Spray Foam
Post-Bid
Reidsville, NC 27230

Removal of Carpet Wall Covering and Paint in Elevator Lobbies: Archdale Building
Post-Bid
Raleigh, NC 27604

Building AS702 & AS704 Spalling Repairs
Results
$150,000 to $160,000 est. value
Camp Lejeune, NC

B-4293 Separate M_F Sleeping Quarters Crash Fire & Rescue
Results
$25,000 to $100,000 est. value
Cherry Point, NC 28533

Door Hardware Replacement
Alteration
Bidding
Kinston, NC

Train Station Window and Wall Restoration Project
Post-Bid
Rocky Mount, NC 27804

Contract for on Call Construction Manager
Results
Greensboro, NC 27402

Kitchen Cabinets
Post-Bid
Robersonville, NC 27871

Fire Station #6 Custom Millwork
Results
Salisbury, NC

Comprehensive Purchasing Consortium for CCHRCO
Post-Bid

City Hall Interior Repairs
Renovation
Results
Less than $9,720 est. value
Wilmington, NC 28402

Recreation Athletics and Activity Center Shower Coating
Post-Bid
Hendersonville, NC 28792

Install Safety Padding for Durham County Detention Facility Holding Cells
Results
Less than $159,197 est. value
Durham, NC 27701

Reported 02/08/2022 12:00 AM
Project Title

Wagoner Hall Booth Installation

Physical Address View project details and contacts
City, State (County) Wilmington, NC 28403   (New Hanover County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall provide, deliver, and install custom booths that meet the following specifications. Contractor is responsible for disassembling the current booths and moving them to a central location within the dining hall so the University’s Surplus Department can pick-up the old booths. The tables in-between booths will remain in place. Contractor is responsible for providing all equipment to offload, disassemble existing booths, assemble and install new booths. Contractor is responsible for the disposal of trash associated with the installation project.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents