Similar Projects
Interurban Trailhead - Site Work
Bidding
$45,000 est. value
Watertown, WI 53094

Site Maintenance and Lawn Mowing
Bidding
Burlington, WI

Timeless Timber Site Commercial Redevelopment
Post-Bid
Ashland, WI 54806

CVTC TEC Phase 1 Parking Lot
New Construction
Post-Bid
Eau Claire, WI 54703

East Park Commerce Center - Phase 1
Results
Stevens Point, WI 54481

Utility Renovations - Mechanical
Results
Less than $3,000,000 est. value
Madison, WI 53703

Haribo Candy Manufacturing Plant
New Construction - 575,266 SF
Construction
$300,000,000 est. value
Kenosha, WI 53142

13 Lot Single Family Sub Division
New Construction
Construction
Mequon, WI 53097

Timber Bluffs Acres
New Construction
Pending Verification
Eau Claire, WI 54701

Refrigerator/Freezer Install/Remove/Replace
Term Contract
Post-Bid
Racine, WI 53402

Dunning Street, Jackson Street and Lafollette Avenue Reconstruction Assessment District - 2020
Results
Less than $4,034,805 est. value
Madison, WI 53704

Veterans Memorial Field South Softball Field Site Redevelopment
Post-Bid
Portage, WI 53901

Civil Work at South Landfill
Results
WI

Blanchard Street Parking Lot Developer RFP
Post-Bid
Wauwatosa, WI 53213

Northwest Landfill Initial Grading
Results
Appleton, WI 54911

Last Updated 12/16/2020 01:15 PM
Project Title

TID 1 Site Development Street Extension, Bid Packet 2

Physical Address View project details and contacts
City, State (County) WI   (Waukesha County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The principal items for which proposals are invited are: 1 LS Unclassified Excavation 1 LS Clearing & Grubbing 5,850 SY Mill Existing Asphalt Pavement, 2" 165 LF 34"x53" HE Storm Sewer 112 LF 24"x38" HE Storm Sewer 1 LS Storm Pond 5,930 CY Rock Removal 3,440 LF PC Curb & Gutter, 30" 11,010 SY Select Crush Material, 8" 11,010 SY Base Aggregate Dense, 6" 3,980 TN HMA Pavement 6,250 SY Topsoil & Seeding 6,636 LF Pavement Marking

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents