Similar Projects
Reported | 11/04/2021 12:00 AM |
Project Title | West Silver Eagle Bridge and Overhead Joint Repair |
Physical Address | View project details and contacts |
City, State (County) | Sacramento, CA 95834 (Sacramento County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge, Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | $565,560 |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Partial removal of the bridge deck and sidewalk at existing strip joint seal assemblies at Abutments 1 and 7. Removal of existing strip joint seal assemblies and installation of new strip joint seal assemblies at Abutments 1 and 7, replacement of elastomeric bearings at both abutments, including jacking and temporary support of the bridge superstructure, removal and replacement of sidewalk joint armor at both abutments, and resetting of curb plates at both abutments. The location of work is on the West Silver Eagle Road Bridge and Overhead between Northgate Boulevard and Norwood Avenue. The west approach to the bridge/overhead carries San Juan Road; the east approach carries West Silver Eagle Road (the name changes near the east abutment). The bridge/overhead crosses (from west to east) a levee access road, the Natomas East Main Drain (Steelhead Creek), another levee access road, the Union Pacific Railroad (UPRR)(1 track) and Western Avenue. |
||||||||||||||||||||
Details | Bridge, Renovation.
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |