Similar Projects
Bituminous Concrete in Place
Post-Bid
Leicester, MA

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

World-Wide Water Storage Tank Remediation
Term Contract
Results

Complete Streets Project
Results
$525,000 est. value
Gardner, MA

Shrewsbury Maple Retail Office
New Construction, Addition - 2,000 SF
Construction
Shrewsbury, MA 01545

Auburn Commerce Park Site Development
New Construction
Construction
Auburn, MA 01501

Millbury Street Apartments
Demolition, New Construction, Infrastructure
Pending Verification
$13,000,000 CJ est. value
Worcester, MA 01607

Millbury Street Apartments
Demolition, New Construction, Infrastructure
Pending Verification
$13,000,000 CJ est. value
Worcester, MA 01607

Annual Roadway Maintenance Contracts
Infrastructure
Post-Bid
Holden, MA

Quabbin Aqueduct Shaft 2 Repairs
Results
Holden, MA

Henry Heywood Memorial Hospital Addition
Addition, Demolition, Infrastructure - 40,115 SF
Pending Verification
$37,960,521 CJ est. value
Gardner, MA 01440

General Highway Maintenance
Infrastructure
Post-Bid
North Brookfield, MA

Assabet Hill Tank Improvements
Results
$232,254 est. value
Northborough, MA 01532

Road Construction Work and General Town Road Maintenance Work for Fiscal 2022
Infrastructure
Post-Bid
Oakham, MA

Bridge Cleaning, Painting, and Related Work including Structural Steel Repairs to 4 Bridges along Interstate 91 Over Route 141
Results
$1,324,360 est. value

Last Updated 10/04/2022 09:02 AM
Project Title

Gardner Transmission Main Replacement Project

Physical Address View project details and contacts
City, State (County) Gardner, MA 01440   (Worcester County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected October 2022 , Construction documents
Bids Due View project details and contacts
Estimated Value $827,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of April 27, 2022, the project has been cancelled. The work of this contract generally consists of replacing approximately 14,000 linear feet of 16-inch diameter ductile iron water main, including valves, fittings, and associated appurtenances from the Crystal Lake Water Treatment Facility to the James Street water storage tanks in the City of Gardner. The water main will be installed in existing paved roadways and through a cross country easement. This contract consists of temporary pavement on all existing roadways. The existing 16-inch diameter cast iron transmission main shall remain in service during construction and be abandoned in place after the new 16-inch diameter ductile iron water main is installed and in service.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents