Similar Projects
Road Work - Azalea Drive Sidewalk Project TST
Infrastructure
Bidding
North Charleston, SC 29405

Repaving Asphalt Parking Lot at Springfield Park
Infrastructure
Bidding
Mauldin, SC

New Parking Lot
Post-Bid
Cheraw, SC 29506

CVS #7016 - ADA Site Renovations
Renovation - 2,491 SF
Post-Bid
Pawley's Island, SC 29585

Concrete Drives
Results
Gray Court, Waterloo, SC 29645

Ramp Modification
Results
Less than $20,000 est. value
Pageland, SC 29728

CVS #3565 - ADA Site Renovation
Renovation - 10,186 SF
Construction
Cheraw, SC 29520

Sidewalks on West Side of Sunset Drive From Ramblin Road to Lady St. (Approx. 1000 Feet)
Infrastructure
Bidding
$50,000 to $59,000 est. value
South Congaree, SC

Resurface Existing Eigth (1/8) Mile Walking Track
Post-Bid
Saint Stephen, SC 29479

Hampton Avenue Sidewalk
Results
Less than $590,288 est. value
Aiken, SC 29801

Sidewalks On North Side, Ramblin Rd From Hwy 302 To Pine St. (Approx. 1000 Feet)
Infrastructure
Bidding
$50,000 to $59,000 est. value
South Congaree, SC

Parking Lot Reseal and Striping
Post-Bid
Florence, SC 29506

St. Julian Devine Community Center Site Improvements
Results
Less than $399,557 est. value
Charleston, SC 29403

Accessibility Improvements Part 1 Parking and Park Center Access, Isle of Palms County Park
Infrastructure
Bidding
Isle of Palms, SC 29451

Shot Pouch Greenway
Post-Bid
Sumter, SC 29150

Last Updated 09/23/2021 02:05 PM
Project Title

I-95 Loop Project Streetscape Phases 2 and 10

Physical Address View project details and contacts
City, State (County) Walterboro, SC 29488   (Colleton County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of streetscape project on SC 63 (Sniders Highway/South Jefferies Hwy) from Cane Branch Road (S-15-193) to Beachwood Road (S-15-54) and US 15 (North Jefferies Hwy) from Wichman Street (US 17A) to Bells Hwy (SC 64), approximately 3.5 miles, in Walterboro, SC.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents