Similar Projects
Adler Theatre Plaster/Paint Repair - FP085
Alteration
Conception
$975,000 est. value
Davenport, IA 52801

Healthy Homes Repair Program Project
Renovation
Sub-Bidding
$20,000 CJ est. value
Mason City, IA 50401

Ashworth Pool and Northwest Pool Painting Improvements
Alteration
Post-Bid
$200,000 est. value
Des Moines, IA 50312

Nahas Pool Painting Improvements Rebid
Infrastructure
Post-Bid
$135,000 CJ est. value
Des Moines, IA 50315

Leif Erickson Pool Painting and Caulking Project
Alteration
Results
Sioux City, IA 51104

Bridge Painting
Alteration
Results
IA

Grandview Park Bandshell Painting
Alteration
Post-Bid
Sioux City, IA 51104

Bridge Painting
Alteration
Results
IA

Fire Hydrant Cleaning/Painting Project
Infrastructure, Alteration
Post-Bid
Sioux City, IA

Bridge Painting
Alteration
Results
IA

Indoor Pool Sandblasting and Painting
Infrastructure, Alteration
Post-Bid
Coralville, IA 52241

Bridge Painting
Alteration
Results
IA

Fire Hydrant Painting
Alteration
Post-Bid
Cedar Rapids, IA

Bridge Painting
Alteration
Results
IA

Painting Services
Alteration
Post-Bid
$150,000 est. value
Des Moines, IA

Last Updated 09/06/2022 07:33 AM
Project Title

YMCA Painting

Physical Address View project details and contacts
City, State (County) Maquoketa, IA 52060   (Jackson County)
Category(s) Single Trades
Sub-Category(s) Painting
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $90,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Painting will be of the following areas with the noted paint colors: 1. Main Lobby 1.2 Paint wall behind reception desk PNT-T 1.2.1 Sherwin Williams: Match Brand standard 1.2.1.1 C100 I M65 I YO I KO, R0 I G96 I B175, #0060af, PMS 661c 1.3 Paint walls in lobby PNT-1 1.3.1 Sherwin Williams: Alabaster 7008 2. Multipurpose Room 2.2 Paint gypsum walls PNT-1 2.2.1 Sherwin Williams: Alabaster 7008 3. Main Corridor 3.3 Paint walls in corridor PNT-1 3.3.1 Corridor walls : Sherwin Williams Alabaster 7008 3.4 Paint curved soffit and walls by water fountain PNT- N 3.4.1 Sherwin Williams: Match Brand standard 3.4.1.1 C100 I M65 I YO I KO, R0 I G96 I B175, #0060af, PMS 661c 4. Restrooms - Mens, Womens, and Special Needs 4.1 Paint walls in restrooms PNT-1 4.1.1 Special Needs - Sherwin Williams: Alabaster 7008 4.1.2 Touch up mens and womens lockerrooms as needed; Paint mural of a man and woman by each restroom entrance (4) 5. Stairs 5.2 Paint stair railing, step kick plates, wire mesh on stairs PNT-G 5.2.1 Sherwin Williams :Dorian Gray 6. Gymnasium 6.1 Paint walls up through maroon stripe PNT-1 6.1.1 Sherwin Williams: Alabaster 7008 6.2 Clean and touch up both white and blue ducts as needed 6.5 Clean acoustic wall panels per Manufacturer recommendations. 7. Wellness 7.2 Paint walls PNT-1 7.2.1 Sherwin Williams Alabaster 7008 7.4 Clean and touch up white and blue ducts as needed 7.6 Clean exposed ceiling 8. Pool/Natatorium 8.1 Paint walls PNT-1 8.1.1 Sherwin Williams Alabaster 7008 8.2 Paint return to match existing paint 8.3 Clean acoustical wall panels as recommended by Manufacturer; spray touch up as needed 9. Throughout entirety of the facility 9.1 Paint all doors and door frames and wire mesh PNT-G 9.1.1 Sherwin Williams :Dorian Gray 10. Rust (As Needed) 10.1 Treat rust spots as needed with rust inhibitor The City of Maquoketa is seeking bids to repaint the interior of the facility at The Maquoketa Area Family YMCA, a city owned, YMCA IMV managed recreational center. Bidders need to schedule a time to visit the YMCA personally prior to submitting a bid. Contact Scott Warren via email at swarren@maqymca. Required bonds: Please be advised that your quote must include the cost of Performance and Payment bonds that will need to be in effect while the work is being completed. However, you do not have to actually obtain such bonds as a condition for submitting a quote. Upon the award of a contract, but before the "notice to proceed" is issued, the successful bidder must provide these bonds in a form that is acceptable to the City. The successful bidder is advised not to incur any project costs until bonds have been approved.org or by phone at 563-652-6566. Work start date: Monday, April 3rd, 2023 Selection of Bidder & Contract Award: Monday, October 3 rd 2022 OSHA: Contractor and all employees shall abide by all OSHA (Occupational Safety and Health Administration) regulations, and the City and/or the YMCA IMV reserves the right to stop all work if property safety practices are not in use Selection Criteria Staff of The City of Maquoketa and The Maquoketa Area Family YMCA will review submitted proposals and select the contractor based upon (in order of priority): Ability to complete work in the allotted time o Cost o Quality of work / Work history o Expertise and experience The City of Maquoketa and The Maquoketa Area Family YMCA are equal opportunity employers. Insurance: During the term of the project, the Contractor shall maintain, at their sole expense, the following insurance policies. Even if the City and the YMCA IMV have an insurance certification on file, all bids MUST be accompanied with a copy of: 1. The bidder's certificate of liability insurance with a minimum of $1 million for each occurrence and a general aggregate of $2 million 2. Worker's Compensation as required by the laws of Iowa. The City must be given an insurance certificate that names the City and the YMCA IMV as additional insured prior to the contractor's commencement of the project. 3. Comprehensive general liability and property damage with a combined single limit of not less than $1 million per each occurrence. The City must be given an insurance certificate that names the City and the YMCA IMV as additional insured prior to the contractor's commencement of the project. 4. Auto liability and property damage, including hired, rented, owner and non-owned automobiles and vehicles with a combined single limit per each occurrence of $1 million for bodily injury and property damage.

Details

Division 09 - Finishes, Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents