Similar Projects
Airport Terminal Design-Build
New Construction
Bidding
Cairo, GA 39828

Airport Terminal Building
New Construction
Bidding
Donalsonville, GA

Terminal Apron Pavement Rehab
Renovation
Post-Bid
Bainbridge, GA

Downtown Atlanta Greyhound Intercity Bus Facility
New Construction - 14,000 SF
Construction
$8,500,000 est. value
Atlanta, GA 30303

Design-Build Services for New 12-Unit Nested Air Craft T-Hangar
Results
$1,050,000 to $1,150,000 est. value
Hinesville, GA 31313

Terminal Building - Moultrie Municipal Airport
New Construction - 3,600 SF
Bidding
Moultrie, GA

General Aviation Terminal and Hangar Complex Development
New Construction - 52,500 SF
Results
Albany, GA 31701

Improvements to the Airport
Post-Bid
Metter, GA

Concourse D Widening
Renovation
Post-Bid
Atlanta, GA

Construct Air Cargo Apron
Results
Savannah, GA 31408

Sylvester Terminal Building Project
New Construction - 2,600 SF
Bidding
$400,000 to $500,000 est. value
Sylvester, GA

Design-Build Services for an Airport Terminal Building and Area Improvements
Construction
Hampton, GA 30228

Airfield Maintenance (MATOC Contract), North Carolina, South Carolina and Georgia
Results
$250,000 to $45,000,000 est. value
Savannah, GA

Airport Terminal Building
New Construction - 4,300 SF
Post-Bid
$2,250,000 est. value
Jasper, GA 30143

General Aviation Terminal Development
Results
$2,500,000 to $4,500,000 est. value
Perry, GA 31088

Last Updated 02/21/2022 09:16 AM
Project Title

Terminal Building

Physical Address View project details and contacts
City, State (County) GA   (Monroe County)
Category(s) Transportation
Sub-Category(s) Airline/Passenger Terminal
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a Terminal Building and Site work at CY Nunnally Memorial Airport. Major items of work include: All Architectural, Grading Drainage, Base, Paving and Marking.

Details

Airline/Passenger Terminal, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents