Similar Projects
Hamilton Elementary School Enclosure & Entry Upgrades
Renovation
Design
$9,495,000 CJ est. value
Hamilton, AL 35570

Repair Maxwell AFB Elementary School Building 538A and 538A1
Renovation
Design
$10,000,000 to $25,000,000 est. value
Montgomery, AL 36124

Belforest Water System Raw Water Main K-6 Well #5 to Larry Street Road WTF #4
Infrastructure
Bidding
$400,000 CJ est. value
Daphne, AL 36526

2018 PAYGO- North McGregor Avenue Reconstruction
Infrastructure
Bidding
$5,533,257 CJ est. value
Mobile, AL 36608

Electrical Upgrades for Selma City Schools
Renovation
Sub-Bidding
$200,000 CJ est. value
Selma, AL 36701

Michael Figures Park - Combo Athletic Field Lighting
Renovation, Infrastructure
Sub-Bidding
$400,000 CJ est. value
Mobile, AL 36617

Geneva County Jail Site Improvements
Post-Bid
Geneva, AL 36340

Renovation of Breakthrough Charter School
Renovation
Post-Bid
Marion, AL 36756

Spanish Fort Elementary School
New Construction, Renovation - 143,000 SF
Results
$28,549,000 est. value
Spanish Fort, AL 36527

New Benjamin Russel High School Package A - Sitework
Results
Alexander City, AL 35010

Farmville Road Elementary School
New Construction - 73,000 SF
Construction
$17,729,000 est. value
Auburn, AL

Improvements to Hokes Bluff Elementary School
Construction
Gadsden, AL

Grading, Drainage, Pavement, and Bridge on SR-303 (Linden Bypass)
Infrastructure
Design
$92,192,162 CJ est. value
Linden, AL 36748

Randolph County Horizontal Site Improvements Solid Waste Transfer Station
Infrastructure
Bidding
$4,000,000 CJ est. value
Wedowee, AL 36278

HVAC Replacement At Kinston Locker Rooms, New Brockton Locker Rooms and Zion Chapel Gym
Renovation
Sub-Bidding
$300,000 CJ est. value
Kinston, AL 36453

Last Updated 08/02/2022 01:06 PM
Project Title

Phil Campbell Elementary Library Renovation and Expansion

Physical Address View project details and contacts
City, State (County) Phil Campbell, AL 35581   (Franklin County)
Category(s) Education, Government/Public, Heavy and Highway
Sub-Category(s) Elementary School, Library - Public, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Plans and specifications are for viewing purposes only. Official sets must be obtained from McKee and Associates. The project shall be bid excluding taxes. Bids must be submitted on proposal forms furnished by the Architect or copies thereof. No bid may be withdrawn after scheduled closing for receipt of bids for a period of ninety (90) days. The Owner reserves the right to reject any or all proposals and to waive technical errors if, in the Owners judgment, the best interests of the Owner will thereby be promoted. A certified check or Bid Bond payable to Franklin County Schools in an amount not less than five percent (5%) of the amount of the bid, but in no event more than $10,000.00 must accompany the bidder's sealed proposal. Performance and statutory labor and material payment bonds will be required at the signing of the Contract. All bidders bidding in amounts exceeding that established by the State Licensing Board for General Contractors must be licensed under the provisions of Title 34, Chapter 8, Code of Alabama, 1975, and must show evidence of license before bidding or bid will not be received or considered by the Architect. All bidders shall show such evidence by clearly displaying current license number on the outside of sealed envelope in which the proposal is delivered. All RFIs and RFAs regarding the bid documents shall be sent and addressed through emails found on the RFI and RFA forms in the project manual. Note: Only the Rfi and Rfa Forms in the Project Manual Will Be Accepted. The Architect will not accept inquiries via telephone or fax.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Roof and Deck Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Library Equipment, Library Stack Systems, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Study Carrels, Index Card File Cabinets, Portable Audience Seating, Seat and Table Assemblies.
Division 13 - Special Construction.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central HVAC Equipment.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents