Similar Projects
Savannah Harbor DMCA 1N Dike Raising
Design
$1,000,000 to $5,000,000 est. value
Port Wentworth, Savannah, GA

Ashley Avenue Drainage Project
Post-Bid
Less than $80,000 est. value
Marion, SC 29571

Calhoun Avenue Drainage Project
Post-Bid
Spartanburg, SC

Runway 20 Obstruction Removal
Results
Less than $196,000 est. value
Rock Hill, SC

Northgate/Cobb Road Storm Drainage Rehabilitation
Results
Greenwood, SC

FSR 3010 EROSION REPAIRS
Post-Bid
$25,000 to $100,000 est. value
Edgefield, SC

Animal Control Drain Line Repairs
Results
Newberry, SC

Woodcreek Pipe Relocation
Post-Bid
Conway, SC 29528

Benson Campus Under Road Drain Repair
Results
$15,000 to $17,000 est. value
Taylors, SC 29687

Charleston District USACE Industry Day for FY20 and FY21 Civil Works Diking Projects
Post-Bid
Charleston, SC 29403

Drainage Improvements Project at Bryson Elementary School
Results
Simpsonville, SC 29681

Washout Revetment Rebuild/Repair
Post-Bid
Folly Beach, SC 29439

Mathis Road Culvert Replacement
Results
Greenwood, SC

Trench Box-FA
Post-Bid
SC

Thornwood Drive Culvert Project
Results
Spartanburg, SC

Last Updated 01/16/2020 09:19 AM
Project Title

Sandy Island Bulkhead Project

Physical Address View project details and contacts
City, State (County) Pawley's Island, SC 29585   (Georgetown County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Install new vinyl bulkhead (approximately 280 linear feet), complete with walers, cap, and necessary components, in front of existing timber bulkhead materials. Demolish and remove existing bulkhead materials where required. Provide new tie-backs for vinyl wall and backfill to provide uniform grade. Installation of new vinyl bulkhead will require removal of miscellaneous features and vegetation in the construction area. Existing stairs located at the South end of bulkhead shall be removed and disposed of and new stairs reconstructed. Existing aluminum gangway to floating docks will require modification to be removed and reinstalled. Tree removal shall be performed where required.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents