Similar Projects
CDBG Funded Home Repairs - Interior and Exterior Contractor
Term Contract
Bidding
$50,000 est. value
Herndon, VA

Memorial Hall Water Mitigation
Infrastructure, Alteration
Bidding
$350,000 est. value
Lexington, VA 24450

Ceiling Tiles
Term Contract
Post-Bid
Newport News, VA

Insulation at Woodrow Wilson Rehabilitation Center
Post-Bid

Interior Finishes Improvements at Communications Building
Results
Chesterfield, VA 23235

Soundproofing Panels and Installation
Results
Yorktown, VA 23690

Service, Install Metal Panels
Post-Bid
Portsmouth, VA

Lee Center Ceiling and Lighting Maintenance
Results
Alexandria, VA

Wall Project
Post-Bid
Hampton, VA 23669

Window Coverings - Installation & Delivery
Results
Bluemont, VA 20135

Stainless Steel Hand Railing
Alteration
Post-Bid
Richmond, VA

2 Door Heated Reach In Cabinet for Suxxex State Prison II
Results
Chesapeake, Waverly, VA 23891

Furnish, Deliver and Install Solid Surface Countertop
Alteration
Post-Bid
Richmond, VA

Water Damage Repair - Mountain Empire Community College
Results
Big Stone Gap, VA 24219

VCBR Expansion - Range Hood and Crown Molding
Alteration
Post-Bid
Burkeville, VA 23922

Reported 05/14/2022 12:00 AM
Project Title

Sheetrock Repairs, Mckenney Volunteer Fire Department (MVFD)

Physical Address View project details and contacts
City, State (County) McKenney, VA 23872   (Dinwiddie County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $330,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

to replace and repair sheetrock throughout the building of the McKenney Volunteer Fire Department located at 10507 Doyle Boulevard, McKenney, VA 23872. Sheetrock replacement and repairs. See the County's website for the RFQ and details.[ 1. Rooms 101 & 104 (Offices) o Remove and replace approximately 1 foot of sheetrock 2. Rooms 102 & 103 (Training Room and Storage Closet) o Remove and replace approximately 1 foot of sheetrock o Repair sheetrock where needed 3. Rooms 100, 106, 107 & 119 (Front Entry and Hallways) o Remove and replace approximately 1 foot of sheetrock where damaged o Repair sheetrock where needed 4. Room118 (Decon Room) o Repair sheetrock where needed 5. All sheetrock shall be mudded and ready for paint.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents