Project Title

60 Inch Gun Club Pipeline from East 6th Avenue to I-70 Phase 2

Physical Address View project details and contacts
City, State (County) Aurora, CO 80040   (Arapahoe County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $7,400,000 to $7,700,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This is the second phase of a new 60-inch pipeline that connects to an existing 36-inch water main at E. 6th Ave. and proceeds north through city right-of-way east of Gun Club Rd., under I-70 via a 430-foot-long tunnel to an existing 30-inch water main adjacent to Furniture Row. The pipeline is approximately 7,100 lineal feet in total length. Phase II of the project will install the remaining 4,860 lineal feet of pipeline and the trenchless crossing under I-70.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents