Similar Projects
Miro Corners Parking
New Construction
Conception
$665,468 est. value
Hollywood, FL 33314

Osceola Technical College (TECO) Parking Lot Expansion
Post-Bid
Kissimmee, FL 34744

Sidewalk Replacement at Public Housing Property
Post-Bid
Eustis, FL 32726

ADA Curb Ramp Improvements-Westside - Part 1- Section 3 - PQ Horizontal
Results
Less than $1,158,847 est. value
Jacksonville, FL 32099

SW 27th Multi-Use Path
Results
Less than $367,000 est. value
Gainesville, FL

AutoNation Vehicle Storage Lot - Parking Area Upgrades
Construction
$750,000 est. value
Orlando, FL 32807

Widen/Resurface Exist Lanes/Sidewalk/Bicycle Lanes
Post-Bid
Less than $1,378,994 est. value
FL

West Bay Drive/Pinellas Trail Gateway
Results
Less than $1,802,333 est. value
Largo, FL

Repair Several Walkways and Parking Spaces at Rental Properties
Post-Bid
Bradenton, FL 34208

City of Freeport - Pool Parking Lot Paving
Results
Less than $39,266 est. value
Freeport, FL

Park Asphalt Overlay and New Parking at John Stretch Memorial Park, Haverhill Park and Glades Pioneer Park
Post-Bid
Haverhill, FL 33415

Six Mile Cypress Shared use Path from Winkler Avenue to Challenger Boulevard
Results
Less than $145,666 est. value
Fort Myers, FL 33901

Harvest Center Sidewalk Improvements
Post-Bid
Homestead, FL

Parking Lot Resealing at Trails and Tails Park and Veterans Park
Results
Less than $22,000 est. value
Doral, FL 33178

Dixie Manor Apartments Sidewalk Replacement Project
Post-Bid
Boca Raton, FL 33432

Reported 05/15/2021 12:00 AM
Project Title

April Concrete Ramp Work

Physical Address View project details and contacts
City, State (County) Gainesville, FL 32641   (Alachua County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Concrete Ramp for 2626 E. Univ. Ave. unit 72 1. Install a “concrete cap” (approx. 4”) over existing concrete front porch at dwelling unit entry matching the existing dwelling unit floor elevation. The “concrete cap” is to have a slope of 1 in 50 to allow for drainage. 2. Remove connecting concrete sidewalk as needed to form/pour a 5’ wide sidewalk from the entry porch to the existing concrete parking pad Concrete Ramp for 205/207 SE 26th Terrace 1. Install a “concrete cap” (approx. 4”) over existing concrete front porches at dwelling unit entry matching the existing dwelling unit floor elevation. The “concrete cap” is to have a slope of 1 in 50 to allow for drainage. 2. Remove connecting concrete sidewalk as needed to form/pour a 5’ wide sidewalk from the entry porches of units 205 /207

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents