Similar Projects
Repair Entry Control Point
Infrastructure
Bidding
$5,000,000 CJ est. value
Duluth, MN 55811

Repair Apron 22
Infrastructure
Bidding
$500,000 CJ est. value
Duluth, MN 55811

Forestry R2 NE Region Ground Site Preparation and Release
Post-Bid
Aitkin, Cloquet, Deer River, Hibbing, Littlefork, Tower, Two Harbors, MN

Scientific Drilling Operations
Infrastructure
Post-Bid
Soudan, MN 55782

FY20 Duluth Vessel Yard Repairs
Results
$5,000,000 to $10,000,000 est. value
Duluth, MN 55802

Household Hazardous Waste Site Grading and Pavement Improvements
Infrastructure
Results
Duluth, MN

Zentih Tiny Home Neighborhood
New Construction, Infrastructure - 19,250 SF
Pending Verification
Duluth, MN 55806

Lincoln Park Site Improvements
Infrastructure
Bidding
$230,000 CJ est. value
Duluth, MN 55806

Scientific Drilling Operations for 2022
Infrastructure
Post-Bid
Soudan, MN 55782

Maintenance Building Storage Bay
Addition, Infrastructure
Results
Saginaw, MN 55779

Breitung McKinley Park Trail
Infrastructure
Bidding
$190,000 CJ est. value
Soudan, MN 55782

2022 Vermilion RV Park Site Development
Infrastructure
Post-Bid
$400,000 est. value
Tower, MN

Surface Soil Excavation at Former Bud's Place
Infrastructure
Results
$85,000 est. value
Floodwood, MN 55736

RFP Engineering - City-Wide Lead Water Service Replacement
Infrastructure
Bidding
$200,000 CJ est. value
Duluth, MN 55802

2022 King Road Lift Station
Renovation, Infrastructure
Post-Bid
$520,000 CJ est. value
Orr, MN 55771

Last Updated 07/26/2022 01:33 PM
Project Title

Clure Public Marine Terminal - Duluth Seaway Port Authority

Physical Address View project details and contacts
City, State (County) Duluth, MN 55802   (Saint Louis County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $10,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Repair and rebuild 1,175 feet of failing dock wall on Berth 11 at the Clure Public Marine Terminal in Duluth. As of July 26, 2022, a design schedule has been provided indicating an construction bid package scheduled for August 2022 with construction is slated to begin in October 2022; however, the firm timeframes has not been disclosed.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents