Similar Projects
Bluff Falls Subdivision
New Construction - 119,000 SF
Conception
Edwardsville, IL 62025

8 Single-Family Dwellings
New Construction - 23,552 SF
Conception
Edwardsville, IL 62025

Weatherization Contractors
Renovation
Bidding
$30,000 CJ est. value
Edwardsville, IL 62025

Johnson Road Phase 2 Sidewalk Improvements
Infrastructure
Bidding
$400,000 CJ est. value
Granite City, IL 62040

Weatherization Materials
Term Contract
Sub-Bidding
Edwardsville, IL 62025

Demolition of 2618 Amelia Street
Demolition, Infrastructure
Sub-Bidding
$30,000 CJ est. value
Alton, IL 62002

(IDIQ)(MAC) for Environmental Services and Remedial Actions
Post-Bid
$50,000 to $250,000 est. value

Weatherization 100 Year Floodplain Project
New Construction
Post-Bid
Granite City, Madison, IL 62040

Riverfront Development Phase 8
Results
$2,727,884 est. value
Alton, IL 62002

Road Improvements
Infrastructure
Results
Granite City, IL

2022 Bond - Highland Primary School and Middle School Addition - Highland CUSD #5
Addition, Demolition, New Construction, Infrastructure
Pending Verification
$40,000,000 CJ est. value
Highland, IL 62249

9 Single-Family Dwellings
New Construction - 266,580 SF
Conception
Edwardsville, IL 62025

Removal and Replacement of Current Roads with Asphalt
Infrastructure
Bidding
$281,000 CJ est. value
East Alton, IL 62024

Asbestos Abatement
Post-Bid
Alton, IL 62002

Structure Installation
Infrastructure
Results
Godfrey, IL 62035

Last Updated 08/09/2022 06:07 AM
Project Title

Asbestos Removal at 2316 Agnes Street

Physical Address View project details and contacts
City, State (County) Alton, IL 62002   (Madison County)
Category(s) Heavy and Highway, Residential, Single Trades
Sub-Category(s) Environmental, Single-Family Homes, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $40,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Alton will receive bids for asbestos removal at 2316 Agnes Street for the Building and Zoning Department City reserves the right to waive any informality and to reject any or all bids. This is a prevailing wage project.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents