Similar Projects
Gravity Sewer Manhole and Cover, Purchase of
Post-Bid
West Palm Beach, FL 33415

Pipeline Wet Tapping and Line Stop Continuing Construction Contract
Term Contract
Post-Bid
$5,500,000 est. value
West Palm Beach, FL 33416

State Road A1A Water Main Improvements - Phase 2
Results
$1,500,000 to $2,000,000 est. value
Gulf Stream, FL

State Road A1A Gravity Sanitary Sewer Closed Circuit Television Inspection
Results
Highland Beach, FL 33487

Pipeline Cleaning Services
Term Contract
Post-Bid
West Palm Beach, FL 33415

Underground Contractor Services
Term Contract
Results
Highland Beach, FL 33487

Sanitary Sewer Collection System Rehabilitation
Post-Bid
FL

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Aerial (Pipe) Crossing, Maintenance Services
Term Contract
Post-Bid
Palm Beach, FL

Nottingham Boulevard and Miller Avenue Utility Improvements
Results
Less than $3,500,000 est. value
West Palm Beach, FL 33402

Pre-Qualification of Vendors Ductile Iron-Pipe and Fittings
Term Contract
Post-Bid
West Palm Beach, FL

Valve, Flow Control, Keystone, Purchase and Delivery
Results
FL

Flushing Hydrants, Purchase and Delivery Of
Post-Bid
FL

South County Reclaimed Water Transmission Pipeline Phase 1A
Results
Less than $10,300,000 est. value
West Palm Beach, FL

Emergency Restoration Services
Post-Bid
Palm Beach Gardens, FL

Last Updated 08/27/2021 01:50 PM
Project Title

Construction Manager-at-Risk for Belmonte Road and Pershing Way Water and Sewer Improvements

Physical Address View project details and contacts
City, State (County) West Palm Beach, FL   (Palm Beach County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work will include construction of water main and sanitary sewer mains, replacement of a force main, rehabilitation of a lift station, rehabilitation of stormwater system, rerouting of water services and sanitary sewer laterals, and reconstruction of roadway (including curb, driveway, and sidewalk).

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents