Similar Projects
Last Updated | 11/09/2020 09:12 AM |
Project Title | Ccp Infrastructure - Ridge Tunnel Repairs |
Physical Address | View project details and contacts |
City, State (County) | Bowling Green, OH (Wood County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dam/Tunnel |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $3,190,249 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The planned scope of work for these base bid 2021 Infrastructure Improvements include the Ridge Street tunnel top replacement and wall repairs, sealing, internal repairs/replacements to piping supports and interior tunnel lighting. In addition to the connection of the chilled water systems to chilled water extensions in Ridge Street including re-paving and associated repairs. As part of the alternate scopes of work, improvements may include any one and/or a combination of the following: Fire Alarm Upgrades to CCP1, Condenser Water Pump Mods to CCP1, Chilled Water Extension to Student Union Repave Service Area at Eppler/Hayes , Adding pump condensate/high pressure condensate insulation/jacketing and/or Sealing of Tunnel Tops. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |