Similar Projects
Guild Solar Facility
New Construction
Conception
Pittsfield, MA

Sizer Road Solar Photovoltaic Project
New Construction
Design
Wales, MA

Commercial Solar Installation
New Construction
Design
Belchertown, MA

TMLP Cleary-Flood Station (Power Plant) - General Bids
Results
$900,000 est. value
Taunton, MA

TMLP Cleary-Flood Station(Power Plant),1314 Somerset Avenue
Results
Less than $2,100,000 est. value
Taunton, MA

Exelon West Medway II Facility
New Construction - 21,200 SF
Construction
$4,117,000 est. value
Medway, MA

Franklin Solar Project
New Construction
Pending Verification
Franklin, MA

Northeast Energy Center
New Construction
Pending Verification
Charlton, MA

Commercial Solar installation
New Construction
Design
Belchertown, MA

2019 Barnstable High School O&M Services (Run Time) for 250KW Natural Gas Cogeneration System
Term Contract
Results
Hyannis, MA 02601

Wakeby Road Solar Array
New Construction
Pending Verification
Barnstable, MA

Conant Road Solar Photovoltaic Project
New Construction
Design
Athol, MA

Swan Holt Box Solar
New Construction
Pending Verification
Carver, MA

Fairland Farm Solar Farm
New Construction
Design
Norton, MA

Snapit Road Solar
New Construction
Pending Verification
Carver, MA 02330

Last Updated 07/16/2019 09:34 AM
Project Title

Renovation/Improvement Project Peabody Municipal Light Plant - General Bid

Physical Address View project details and contacts
City, State (County) Peabody, MA   (Essex County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Power Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Project consists of but not limited to: 1. Remove existing sliding aluminum doors at main entrance vestibule. 2. Remove existing walls, doors, floor finishes and other components shown on the drawings at current customer service area. 3. Remove portions of wall finishes and existing carpeting at auditorium as shown in the drawings to accommodate new floor installation. 4. Remove existing office cubicles at engineering department to accommodate new work. 5. All work either shown on the Drawings or included in the specifications unless specifically indicated as not to be done. 6. All existing materials and debris shall be removed and disposed of in accordance with all applicable State, Federal and Local Codes and Regulations. 7. Disconnect and reconnect all existing Electrical, Plumbing and HVAC Equipment, Devices, Fixtures, Piping, Conduit and Wiring etc. as required to perform the work. All work to be performed by appropriate licensed tradesman. Obtain permits as required. Disconnect and Reconnect the following: 8. Install new sliding aluminum storefront doors at main entrance vestibule 9. Install new reception desk. 10. New customer service area. 11. Infill floor in auditorium and install new communications and presentation equipment. 12. New offices in engineering department with new carpeting, lighting and communications network. 13. New office area to replace existing gym. 14. New ACT ceiling in lobby and customer service area. 15. Replace existing metal siding panels at exterior entrance
Details
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, High-Performance Structural Concrete, Concrete Finishing, Specialty Placed Concrete, Precast Structural Concrete, Precast Concrete Specialties.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Access Doors and Panels, Coiling Doors and Grilles, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Exterior Specialties, Security Mirrors and Domes.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment, Security Equipment.
Division 13 - Special Construction, Radiation Protection, Special Instrumentation, Seismic Instrumentation.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Personal Protection Systems, Electronic Detection and Alarm, Fire Detection and Alarm, Radiation Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Grading, Earthwork Methods, Soil Treatment, Soil Stabilization.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Fuel Distribution Utilities, Electrical Utilities, Electrical Utility Transmission and Distribution, Utility Substations, Utility Transformers, High-Voltage Switchgear and Protection Devices, Medium-Voltage Utility Switchgear and Protection Devices, Communications Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors, Cranes and Hoists.
Division 46 - Water and Wastewater Equipment.
Division 48 - Electrical Power Generation, Common Work Results for Electrical Power Generation, Instrumentation and Control for Electrical Power Generation, Electrical Power Generation Equipment, Electrical Power Generation Testing.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents