Similar Projects
West Higgins Road Gas Station & Retail
New Construction, Demolition - 7,100 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Hoffman Estates, IL

West Higgins Road Gas Station & Retail
New Construction, Demolition - 7,100 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Hoffman Estates, IL

District 1860 Mixed Use Development
New Construction - 150,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Lincolnwood, IL 60712

7-Eleven Gas Station & Car Wash
New Construction
Design
Northbrook, IL 60062

Northwest Wheeling CNG Bus Maintenance & Storage Facility
Renovation, Build-Out, Demolition
Bidding
$65,000,000 est. value
Wheeling, IL 60090

Aldi Val #06
Renovation - 2,192 SF
Bidding
$1,000,000 to $5,000,000 CJ est. value
Glenwood, IL 60425

Love's Travel Stop
New Construction
Post-Bid
South Holland, IL

Aldi 85
New Construction - 117,520 SF
Post-Bid
$10,000,000 CJ est. value
Morton, IL 61550

Austin - Laramie State Bank Site - Developer RFP
Results
Chicago, IL 60651

Northwest Wheeling CNG Bus Maintenance & Storage Facility
New Construction
Results
$40,000,000 est. value
Wheeling, IL 60090

Caputo`s Fresh Market
New Construction - 15,000 SF
Construction
Mount Prospect, IL 60056

North Harlem Shopping Center
New Construction - 41,600 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Norridge, IL 60706

Aldi
New Construction - 19,500 SF
Pending Verification
North Riverside, IL 60546

Ricky Rockets Gas Station
New Construction, Addition, Build-Out - 8,400 SF
Pending Verification
Itasca, IL

JET Foods
Renovation
Conception
Rosemont, IL 60018

Last Updated 02/21/2022 11:33 AM
Project Title

Thorntons Gas Station & Convenience Store

Physical Address View project details and contacts
City, State (County) Mundelein, IL 60060   (Lake County)
Category(s) Commercial
Sub-Category(s) Gas Station, Supermarket/Convenience Store
Contracting Method
Project Status Obtained from a News Source
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Gas Station, 1 Story Above Grade, 4,400 SF New Construction, 10 Fuel Pump(s), Supermarket/Convenience Store, New Construction, 2.80 Acres.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Foodservice Shelving, Food Dispensing Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines.
Division 12 - Furnishings, Countertops, Rugs and Mats, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Liquid Fuel Distribution, Gasoline Distribution, Gasoline Piping, Gasoline Pumps, Diesel Fuel Distribution, Diesel Fuel Piping, Diesel Fuel Pumps, Fuel-Storage Tanks, Underground Fuel-Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents