Similar Projects
Caseys General Store / Evansville
New Construction, Infrastructure
Conception
$1,350,000 CJ est. value
Evansville, IN 47708

Wallace Fork Road Bridge #200 over Little Pigeon Creek - Evansville Metropolitan
Addition, New Construction, Infrastructure
Conception
$2,500,000 CJ est. value
Evansville, IN 47708

Fifth and Main (fka 420 Main Street Mixed Use)
New Construction, Infrastructure
Design
$50,000,000 CJ est. value
Evansville, IN 47708

Fifth and Main (fka 420 Main Street Mixed Use)
New Construction, Infrastructure
Design
$50,000,000 CJ est. value
Evansville, IN 47708

Pedestrian Bridge Construction
New Construction, Infrastructure
Bidding
$2,080,500 CJ est. value
Evansville, IN 47714

Pedestrian Bridge Construction
New Construction, Infrastructure
Bidding
$2,080,500 CJ est. value
Evansville, IN 47714

Green River Road Trail Project
Infrastructure
Post-Bid
$40,000 est. value
Evansville, IN 47725

2022 Mill and Overlay
Infrastructure
Post-Bid
$713,000 est. value
Evansville, IN

Asphalt Resurface
Infrastructure
Results
IN

Cedar Hall Exterior Painting and Site Improvement
Infrastructure, Alteration
Results
Evansville, IN 47713

Baker Flat / Evansville
New Construction, Infrastructure
Construction
$11,000,000 CJ est. value
Evansville, IN 47710

2022 Mill and Overlay - Phase II
Infrastructure
Construction
$1,097,983 CJ est. value
Evansville, IN 47708

Ohio River Crossing Projects - Kentucky Transportation Cabinet
Infrastructure
Pending Verification
$1,212,000,000 CJ est. value
Evansville, IN 47714

Ohio River Crossing Projects - Kentucky Transportation Cabinet
Infrastructure
Pending Verification
$1,212,000,000 CJ est. value
Evansville, IN 47714

New Harmony Road Bridge #140 over Tributary of Pigeon Creek - Evansville Metropolitan
Infrastructure
Conception
$3,400,000 CJ est. value
Evansville, IN 47720

Last Updated 07/13/2023 11:25 AM
Project Title

New Bridge Construction - I-69

Physical Address View project details and contacts
City, State (County) Evansville, IN 47725   (Vanderburgh County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contract : B -44119-A Project Control No. 2101318 2201152 2201154 2201156 Federal/State No. 2101318 2201152 2201154 2201156 Location New Bridge Approach Vanderburgh County - on I-69 From Ky Sl to 0.6 Mile W of S. Green River Road (Rp 000+0000 to 001+0008) New Bridge Construction I69-000-10744 Prestressed Concrete Bulb-t Beam Vanderburgh County - on I-69s Over Ohio River Floodplain, 1.50 Miles E of Us 41 New Bridge Construction I69-002-10776 Prestressed Concrete Bulb-t Beam Vanderburgh County - on I-69s Over Eagle Creek, 1.20 Miles E of Us 41 (Rp 000+0000 to 000+0054) New Bridge Construction I69-002-10778 Prestressed Concrete Bulb-t Beam Vanderburgh County - on Ramp From Vmp to I-69s Over Eagle Crk, 1.14 Mi E of Us 41 (Rp 001+0054) Qualifications: A(A) D(B) Contractors desiring to submit electronic bids via Electronically must register with INDOT as a valid bidder by submitting the form provided on the INDOT Letting Information internet page. Failure to register will cause failure of the Electronic bid submission process. A bidder may request valid bidder status by submitting the bidder registration form until 9:00 AM on the bid opening date. An executed bid bond shall be included with all bids. Only electronic bid bonds submitted through the designated electronic medium, either Surety2000 or Tinubu Surety Solution, will be accepted with the bid. A fully executed performance bond shall be included with all bids, except on contracts for roadside mowing, vegetation control, demolition, landscaping, fencing, seeding and sodding, bridge painting, and guardrail installations of $100,000 or less, when the bidder may elect not to furnish a performance bond. Electronically does not support submittal of the performance bond. The performance bond must be submitted to the Construction Letting email inbox or be delivered on paper by the time set for receipt of proposal bids. Each contractor that submits a proposal bid in the amount of $150,000 or more for highway improvements described in this notice is required to submit with that bid a written plan for a program to test the contractor's employees for drugs. The plan shall be in compliance with Indiana Code 4-13-18. The plan must be submitted to the Construction Letting email inbox or deposited with the INDOT Prequalification Engineer by the time set for receipt of proposal bids. INDOT - Call 101 - New Bridge Construction - I-69

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents