Similar Projects
Water System Hydraulic Model
Bidding
Boston, MA

Furnish and Deliver Water Meters
Bidding
$350,000 est. value
Needham, MA

Fire Alarm and Sprinkler System Maintenance and Repair Services
Post-Bid
Less than $202,500 est. value
Brookline, MA

Installation of 6-Inch to 10-Inch Cement Lined Ductile Iron Water Mains
Post-Bid
Less than $1,400,000 est. value
Plainville, MA 02762

Canton Street Water Main
Results
Less than $1,200,000 est. value
Dedham, MA

Water Shut-Off Valves Replacement
Results
Less than $35,000 est. value
Wellesley, MA 02481

Low Service Pressure Reducing Valve Improvements
Bidding
$11,200,000 est. value
Boston, MA

Washington Street and Bugbee Street Water Main Improvements
Post-Bid
Plainville, MA 02762

Miscellaneous Water and Sewer Supplies
Term Contract
Results
Less than $300,000 est. value
Needham, MA

Replacement of Lead Services
Bidding
$999,437 est. value
Boston, MA

Holliston and Brentwood Street Water Main Improvements - Contract 2
Post-Bid
Less than $2,600,000 est. value
Medway, MA 02053

2020 Water Main Improvements Contract 1
Results
Less than $3,800,000 est. value
Canton, MA

Renewing Approximately 60 Water Services
Bidding
Less than $700,000 est. value
Bellingham, MA

Holliston and Brentwood Street Water Main Improvements - Contract 1
Post-Bid
Less than $3,200,000 est. value
Medway, MA 02053

Lincoln Street Waterline Improvements
Results
Less than $1,292,535 est. value
Franklin, MA 02038

Reported 12/04/2020 12:00 AM
Project Title

Automatic Meter Reading (AMR) System Supply and Implementation

Physical Address View project details and contacts
City, State (County) Sharon, MA   (Norfolk County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Water meters, registers and AMR modules shall be installed by others under a separate contract. The Proposer shall also furnish all materials, equipment, and incidentals necessary to train and support the meter installation contractor and Owner in the proper installation of meters, registers, and AMR modules.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents