Similar Projects
2021 Stormwater Improvements
Infrastructure
Bidding
Moon Township, PA

Andrew Circle Storm Sewer Improvement Project
Infrastructure
Bidding
Elwyn, PA 19063

Lower Yoder Sanitary/Storm Sewer Separation Project Phase III
Post-Bid
Johnstown, PA 15901

2020 Whitehall Borough Capital Lining Program
Post-Bid
Pittsburgh, PA 15236

Dunn Avenue Storm Sewer Repairs
Results
Washington, PA 15301

2020 Whitemarsh Township Intersection Improvements Program
Results
Lafayette Hill, PA 19444

Ridgeview/Lakeview Drive Stormwater Retrofit
Renovation - 38,100 SF
Construction
Lake Ariel, PA 18436

11th Street Storm Sewer Extension
Infrastructure
Bidding
Monaca, PA 15061

2020 Emergency Annual Sanitary and Storm Sewer Repair
Post-Bid
Clairton, PA 15025

Harford Road Mulch Trail and Stormwater Pipe and Structures
Results
Wayne, PA 19087

Storm Sewer Project In Dunbar Township
Post-Bid
Uniontown, PA 15401

North Main Street Stormsewer Diversion Project
Results
Less than $113,846 est. value
Chambersburg, PA 17201

Construction of Storm Water Management Facilities
Post-Bid
Plymouth, PA 18651

Broadway Storm Sewer Replacement
Results
$259,448 est. value
Bangor, PA 18013

Lucerne Avenue Storm Sewer Replacement
Post-Bid
McKnight, PA 15237

Reported 10/05/2021 12:00 AM
Project Title

Bucks Villa Rehab Project - Sewer

Physical Address View project details and contacts
City, State (County) New Hope, PA 18938   (Bucks County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Owner
Owner View project details and contacts
Architect View project details and contacts
Description

Sewer Pipe Specifications (1) Excavate and replace existing buried trap. (2) Remove directional cleanout. (3) Install new cleanout and hydrolat. (4) Excavate and replace sewer pipe from transfer to the end of the property. (5) Replace excavated concrete. (6) Repair/replace any blacktop removed during replacement of the sewer pipe. (7) Secure a dumpster which may be placed in the driveway of the construction site to remove all debris from the site daily. (8) Secure all necessary permits and submit any necessary plans to New Hope Borough that may need to be submitted with the Zoning Permit Application.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Excavation and Fill, Excavation.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents