Similar Projects
New Riverside Park / Barn Site - 00085 - Town of Bluffton
Infrastructure
Conception
$3,872,112 CJ est. value
Bluffton, SC 29909

Buck Island Road Drainage Improvements - 00100 - Town of Bluffton
Infrastructure
Conception
$87,500 CJ est. value
Bluffton, SC 29910

Desai Hotel / Beaufort
New Construction, Infrastructure - 3,600 SF
Design
$30,000,000 est. value
Beaufort, SC

Coastal States Bank / Beaufort
New Construction, Infrastructure - 2,800 SF
Design
$700,000 CJ est. value
Beaufort, SC 29902

RFQ Engineering - Engineering and Consulting Services for Beaufort County Solid Waste and Recycling
Infrastructure
Bidding
$80,000 CJ est. value
Beaufort, SC 29902

P475 DBB Aircraft Maintenance Hangar
New Construction, Infrastructure
Bidding
$250,000,000 CJ est. value
Beaufort, SC 29902

Valvoline Oil Change / Beaufort
New Construction, Infrastructure - 3,305 SF
Sub-Bidding
$800,000 CJ est. value
Beaufort, SC 29907

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Buckwalter Recreation Complex Expansion (BRACE) - Beauford County
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$500,000 CJ est. value
Bluffton, SC 29910

Hunting Island Booster Pump Station Upgrade
Renovation
Results
Frogmore, SC 29920

Navy Base Intermodal Facility Advanced Work Package project
Demolition, Infrastructure
Results

Pine Court Apartments
New Construction, Infrastructure
Construction
$6,000,000 CJ est. value
Beaufort, SC 29902

Harris Teeter at Lady's Island
New Construction, Infrastructure - 60,850 SF
Construction
$15,000,000 CJ est. value
Beaufort, SC 29907

Washington Square East
New Construction, Infrastructure
Pending Verification
$7,000,000 CJ est. value
Bluffton, SC 29910

Okatie Crossing Shopping Center / Hardeeville
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Okatie, SC 29909

Last Updated 04/17/2023 11:33 AM
Project Title

Broad Creek ASR Well No. 1

Physical Address View project details and contacts
City, State (County) Hilton Head Island, SC 29926   (Beaufort County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $4,500,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Fully operational Aquifer Storage Recovery (ASR) facility. The work for this project will be separated into two parts and bidders may submit on one or both parts: PART A - ASR well, monitoring well and appurtenances; PART B - Wellhead surface facilities, buried piping and utilities including: civil, mechanical, electrical, instrumentation/control and appurtenances. Construction Cost Range: $3.5 to $4.5 million *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents