Similar Projects
Domestic Hot Water Improvements for Stamford Public Schools
Alteration
Bidding
Stamford, CT 06907

Cleaning of Boilers - Public Buildings
Alteration
Bidding
Danbury, CT 06810

J--Boiler Services VA Medical Centers New England
Post-Bid
Hartford, Newington, West Haven, CT - Bedford, Jamaica Plain, Leeds, MA - Manchester, NH - Providence, RI 06111

J--Boiler Services VA Medical Centers New England
Post-Bid
Hartford, Newington, West Haven, CT - Bedford, Jamaica Plain, Leeds, MA - Manchester, NH - Providence, RI 06111

Z--B 29 Boiler and Air Compressors Maintenance and Repair, Naval Submarine Base New London CT
Results
Groton, CT 06349

Replacement of 2 Boilers at John G. Prendergast School
Results
$200,000 to $300,000 est. value
Ansonia, CT 06401

Tunnel Steam and Condensate Pipe Replacement and Repairs
Alteration
Bidding
Orange, CT 06477

Replacing the Hot Water Heater
Post-Bid
New London, CT 06320

Cafeteria Renovations Highland School (Replace Government Freezer)
Results
Cheshire, CT 06410

Boiler Replacement- Csdnb Holmes, Jefferson, Diloreto, Smith Schools
Alteration
Bidding
New Britain, CT

HVAC Systems and Domestic Hot Water Upgrades
Post-Bid
Newington, CT 06111

High Plains Community Center Boiler Replacement
Results
Less than $40,160 est. value
Orange, CT 06477

Killingworth Elementary School Boiler Piping Redesign
Alteration
Bidding
Higganum, CT

JFK School Water Heater Upgrade
Post-Bid
Bridgeport, CT

Fire Head Quarters (HQ) Boiler Replacement Design Services
Results
Cheshire, CT 06410

Reported 05/26/2021 12:00 AM
Project Title

Hurley Hall Domestic Hot Water Heater Replacement

Physical Address View project details and contacts
City, State (County) Windham, CT 06226   (Windham County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work involves the replacement of the existing gas fired high efficiency condensing hot water heater and modifications of piping Summary of Work includes but is not limited to the following 1. Removal and disposal of the existing heater. 2. Modification of the existing domestic hot water piping to facilitate future heater replacements 3. Installation of the new high efficiency 1,000 MBH heater. 4. Reconnecting the new heater to the domestic water and, gas piping. 5. Reconnecting the exhaust duct and combustion air pipes 6. Reconnecting power and controls.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents