Similar Projects
Bid Package #2 - Additions and Renovations to Bibich Elementary - Building Package
Addition, Demolition, Renovation, Infrastructure
Design
$9,434,204 CJ est. value
Dyer, IN 46311

Bid Package #3 - Additions and Renovations to Bibich Elementary - Mechanical/Electrical Package
Addition, Demolition, Renovation, Infrastructure
Design
$3,238,550 CJ est. value
Dyer, IN 46311

Removal and Installation of Bus Shelters Services
Infrastructure
Bidding
$300,000 CJ est. value
Gary, IN 46402

Griffith Levee Rehabilitation and Interior Drainage Improvements
Infrastructure
Bidding
$150,000 CJ est. value
Griffith, IN 46319

2021 Community Crossing Paving
Post-Bid
$1,400,000 est. value
Merrillville, IN

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

West 96th Place Roadway Extension-Phase 2 and Other Paving
Results
Saint John, IN 46373

109th Avenue at Grand Boulevard Improvements
Results
Winfield, IN

2022 CCMG Street Improvement Project
Infrastructure
Construction
$1,533,684 CJ est. value
Highland, IN 46322

2022 CCMG Street Improvement Project
Infrastructure
Construction
$1,533,684 CJ est. value
Highland, IN 46322

St. John Commons
New Construction, Infrastructure
Pending Verification
$18,000,000 CJ est. value
Dyer, IN 46311

Subdivision - Goodwill Store
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Crown Point, IN 46307

Liberty Park Pipe Lining, Crown Point
Infrastructure
Design
$5,000,000 CJ est. value
Crown Point, IN 46307

2021 Street Improvements Phase II West Middlebury Street
Infrastructure
Post-Bid
Shipshewana, IN 46565

2021 Hammond Community Crossing Project HMA Milling and Resurfacing
Results
$1,147,185 est. value
Hammond, IN 46320

Last Updated 09/22/2022 12:19 PM
Project Title

2022-1 Community Crossings Paving Program - Application

Physical Address View project details and contacts
City, State (County) Rising Sun, IN 47040   (Ohio County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction complete as of October 2022 , Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $14,409 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Community Crossings Paving Program Each bid shall be accompanied by a certified check or Each bid shall be accompanied by a certified check or acceptable bidder's bond made payable to the Owner, in a sum of not less than five percent (5%) of the total amount of the bid, which check or bond will be held by the Owner as evidence that the bidder will, if awarded the contract, enter into the same with the Owner upon notification from him to do so within ten (10) days of said notification. Approved performance and payment bonds guaranteeing faithful and proper performance of the work and materials, to be executed by an acceptable surety company, will be required of the Contractor at the time he executes his contract. The bond will be in the amount of 100% of the Contract Price and must be in full force and effect throughout the term of the Construction Contract plus a period of twelve (12) months from the date of substantial completion. The Owner reserves the right to reject any bid, or all bids, or to accept any bid or bids, or to make such combination of bids as may seem desirable, and to waive any and all informalities in bidding. Any bid may be withdrawn prior to the above scheduled time for the opening of bids or authorized postponement thereof. Any bid received after the time and date specified shall not be considered. No bid may be withdrawn after the scheduled closing time for receipt of bids for at least sixty (60) days. The Owner may make such investigations as deemed necessary to determine the ability of the Bidder to perform the work and the Bidder shall furnish to the Owner all such information and data for this purpose as the Owner may request. The Owner reserves the right to reject any bid if the evidence submitted by, or investigation of, such Bidder fails to satisfy the Owner that such Bidder is properly qualified to carry out the obligations of the Agreement and to complete the work contemplated therein. Bids shall be properly and completely executed on bid forms included in the Contract Documents. Bids shall include all information requested by Indiana Form 96 (Revised 2013) included in the Contract Documents. If project is $150,000 or more - State of Indiana requirement as of 7/2018, Bidder is required to submit with bid a written plan for an employee drug testing program that complies with IC 4-13-18-5 and IC 4-13-18-6. Each Bidder is responsible for inspecting the Project site(s) and for reading and being thoroughly familiar with the Contract Documents and Specifications. The failure or omission of any Bidder to do any of the foregoing shall in no way relieve any Bidder from any obligation with respect to its Bid. Any questions shall be directed to Kevin Hay of HWC E n g i n e e r i n g b y e m a i l o n l y a t khay@hwcengineering.com. The deadline for questions is Thursday, June 30th at 10:00 am.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents