Similar Projects
Last Updated | 04/22/2021 05:46 AM |
Project Title | US 30 Melugins Grove Rd and Town Hall Rd, Phase II Engineering for Removal and Replacement of Structures |
Physical Address | View project details and contacts |
City, State (County) | IL (Lee County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $3,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Phase II engineering services are required for the removal and replacement of the structures on sideroads within US 30 Right-of-Way at Melugins Grove Road and Townhall Road, located 1.0 mile and 1.5 miles respectively W. of IL 251. It is anticipated that the proposed improvement may include removal and replacement of sideroad structures and ditches along US 30. The Phase I Combined Design Report has received design approval; however, it may be necessary to review the approved report and issue an addendum, if needed, based on recommended revisions to the proposed scope of work. The following structures are included in this project: • S.N. 052-0040: Melugins Grove Road – Total Replacement • S.N. 052-0041: Town Hall Road – Total Replacement |
Details | |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |