Similar Projects
South Houston Lake Road and Feagin Mill Road Intersection Improvements
Infrastructure
Bidding
Perry, Warner Robins, GA 31069

Pavement Evaluations for Interstate Maintenance
Alteration
Bidding
$25,000 est. value

Lake Joy Road Phase 5 Improvement
Post-Bid
Perry, GA 31069

Oakmulgee Ranger District Road Maintenance
Post-Bid
$2,500 to $5,000,000 est. value

Southern Region Disaster Recovery Support BPA
Results

Grade, Base, and Paving of Terrell Road
Results
Less than $789,048 est. value
Perry, GA 31069

Joint 2020 Local Maintenance And Improvement Grant
Post-Bid
Perry, GA

1.443 Miles of Widening and Reconstruction for Additional Turn Lanes on SR 40 Beginning West of Grove Blvd (CS 481) and Extending East to Truss Plant Rd (PR 718)
Results

Trellis Walk Full Depth Reclamation and Resurfacing
Post-Bid
Centerville, GA 31028

2.786 Miles of Milling and Plant Mix Resurfacing on SR 11 Conn Beginning at SR 7 And Extending East of SR 11
Results
GA

Scott Road Extension Project
Post-Bid
GA 31025

LMIG Street Resurfacing
Results
College Park, GA 30337

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

2021 SPLOST Milling and Resurfacing of Various Streets in Commission Districts 1 and 2
Results
Ellenwood, Forest Park, Lawrenceville, Macon, Morrow, Rex, Riverdale, Stockbridge, Union City, Warner Robins, Woodstock, GA 30294

Joint 2022 Local Maintenance and Improvement Grant
Infrastructure
Post-Bid
Byron, Centerville, Perry, Warner Robins, GA

Reported 03/25/2022 12:00 AM
Project Title

Elberta Road Phase 1 Improvement

Physical Address View project details and contacts
City, State (County) Warner Robins, GA 31099   (Houston County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: The proposed construction consists of furnishing all materials and equipment and performing all labor necessary to complete the Elberta Road Phase 1 Improvement (project roadway length is 1.313 miles). Work includes grading, curb and gutter, sidewalk, base placement, paving (including overlay), storm drainage, traffic signal installation and the implementation of the erosion, sediment, and pollution control plan and comprehensive monitoring program. Further work includes installation of City of Warner Robins and City of Centerville water mains. All work shall be in accordance with the Georgia Department of Transportation standard specifications and supplemental specifications (latest edition), the Georgia Manual for Erosion and Sediment Control (latest edition), and Houston County.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents