Similar Projects
Install Cured in Place Pipe Lining in Condenser Water Piping
Term Contract
Design
Pierre, SD 57501

MIMI Replace Cathodic Protection System Components
Infrastructure
Design
$25,000 to $100,000 est. value
Philip, Wall, SD

Springbrook Acres Water Main and PRV Abandonment
Infrastructure
Bidding
Rapid City, SD

Advanced Metering System for Electric and Water Utilities
Infrastructure
Bidding
Wessington Springs, SD

East 1st Street Extension
Post-Bid
$4,000,000 est. value
Tea, SD 57064

Replacing Existing Main Distribution Areas - Water Department and Installation of Flood Wall Berm at Pelican Sub - Electric Department
Post-Bid
Watertown, SD

2021 Douglas/Washington Streets
Results
Elk Point, SD 57025

Water Meter Replacement - Phase 2
Results
Brandon, SD

Treated Water Pipeline Madison Service Line 2/3A
Infrastructure
Bidding
$14,000,000 to $18,000,000 est. value
Tea, SD 57064

Main Street Streetscape
Post-Bid
Vermillion, SD

33rd Street and Minnesota Avenue Intersection Reconstruction, Utility Improvements, Pavement Repairs and ADA Improvements
Results
Less than $1,760,000 est. value
Sioux Falls, SD

Madison Service Line Segment 2/3A Project
Infrastructure
Bidding
$18,000 est. value
Tea, SD

2021 Water Main Replacement Installation
Post-Bid
Wessington Springs, SD 57382

East Watertown Street Water Main Replacement
Results
Rapid City, SD 57701

Saint Lawrence Utility Improvements
Infrastructure
Bidding
$700,000 est. value
Saint Lawrence, SD

Last Updated 04/26/2022 08:51 AM
Project Title

RCWD/Geddes - Phase 2 City Wide Water Improvements

Physical Address View project details and contacts
City, State (County) Geddes, SD   (Charles Mix County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of replacing the City's existing water metering system with approximately 216 Owner supplied meter pits and metering infrastructure. Replacement of select service and distribution piping is also included along with seeding and asphalt patching.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents