Similar Projects
Flagship Healthcare - Grier Heights
New Construction
Conception
Charlotte, NC 28207

PACE of the Triad
New Construction - 29,943 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Winston-Salem, NC 27105

Wake Medical Office
New Construction - 133,890 SF
Design
$10,000,000 CJ est. value
Cary, NC 27518

Fresenius Medical Care
New Construction - 7,297 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Raleigh, NC

Mt Airy Outpatient Oncology Clinic
Renovation - 9,980 SF
Bidding by Invitation
Mount Airy, NC 27030

Padilla Chiropractic
Renovation - 1,513 SF
Bidding by Invitation
Charlotte, NC 28277

Novant DIMA
Renovation, Addition - 17,554 SF
Post-Bid
$3,500,000 est. value
Durham, NC 27704

Alliance Child Crisis Center
Renovation, Addition - 27,303 SF
Post-Bid
$5,000,000 to $6,000,000 est. value
Fuquay-Varina, NC 27526

Y--P4041 Medical/Dental Replacement, Marine Corps Base Camp Lejeune, North Carolina
- 40,000 SF
Results
$10,000,000 to $25,000,000 est. value
Rocky Point, NC 28457

Roanoke Chowan Community Health Center Woodland Clinic Renovation
Renovation, Addition - 2,680 SF
Results
Less than $354,115 est. value
Woodland, NC 27897

Sharon Road Mixed Use
New Construction, Renovation - 178,500 SF
Construction
$10,000,000 CJ est. value
Charlotte, NC 28211

The Barclay at South Park
New Construction
Construction
Charlotte, NC 28210

Wake Forest Baptist Medical Center Masterplan
New Construction
Pending Verification
Winston-Salem, NC 27157

North Tryon and Mallard Creek
New Construction
Conception
Charlotte, NC 28262

Medical Office
New Construction - 8,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Garner, NC

Last Updated 07/10/2020 01:51 PM
Project Title

Sandhills Center for Mental Health Office Facility Renovation

Physical Address View project details and contacts
City, State (County) Greensboro, NC 27376   (Guilford County)
Category(s) Medical
Sub-Category(s) Medical Office/Outpatient
Contracting Method
Project Status Construction Commenced second quarter 2020
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Renovation of an existing 36,000+ SF Office Building at 3802 Robert Porcher Way

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Wall Coverings, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving.
Division 11 - Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Furnishings and Accessories, Seating.
Division 13 - Special Construction, Radiation Protection.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Healthcare Communications and Monitoring Systems.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents