Similar Projects
Paris Elementary School - Replacement of HVAC Roof Top Units, Vavs and Boilers
Term Contract
Bidding
$400,000 est. value
Taylors, SC 29687

HVAC and Mechanical Products
Term Contract
Post-Bid

Installation of Pipe and Duct Insulation
Post-Bid
Taylors, SC

Greenville - Building 112 Chiller Addition
Results
$280,000 to $330,000 est. value
Greenville, SC 29607

SFMS HVAC Project
Results
Less than $1,699,881 est. value
Fort Mill, SC 29715

Heating, Ventilation, and Air Conditioning (HVAC) Project for East North Street Academy
Post-Bid
Greenville, SC 29607

Partial HVAC Replacement Project at Greer High School
Results
Greer, SC 29651

Covid-19 HVAC Equipment Servicing
Post-Bid
Fort Mill, SC

HVAC Maintenance Platforms - Three Schools
Results
Greenville, Simpsonville, SC 29615

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

SCDMH Piedmont and Greer HVAC Maintenance
Term Contract
Results
Simpsonville, SC 29681

Water Cooled HVAC Chiller - Bon Secours Wellness Arena
Term Contract
Post-Bid
Greenville, SC 29601

Installation of HVAC Boiler/Heating Water System - Eastside High School
Alteration
Results
Taylors, SC 29687

Air Conditioning Contractor Services - Indefinite Delivery Contract (IDC)
Term Contract
Post-Bid
SC

Air Conditioning Service for Activity Buses
Term Contract
Results
Taylors, SC

Last Updated 04/28/2022 04:50 AM
Project Title

Mountain View Elementary School HVAC Replacement

Physical Address View project details and contacts
City, State (County) Taylors, SC 29687   (Greenville County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $700,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of a one-story addition to the existing school which includes new classrooms and new dining room facilities adjacent to the existing dining area. Further, there will be renovations to the existing toilet rooms to provide a barrier free environment. New covered walkways are included and masonry security walls to enclose the entire campus. New structures will consist of steel frame and CMU walls with gypsum wallboard, masonry veneers, concrete slab floors w/VCT finishes, acoustical ceilings, low sloping metal roofs, metal deck roofs, single ply membrane roofing, aluminum canopies, steel frame canopies, storefront and window sash. There will also be refurbishing of the existing classroom facilities that includes paint, lighting and millwork. Exterior work includes grading, drives, parking areas, concrete curbs and gutters and storm drainage.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents