Similar Projects
Chauncey Bikeways
Infrastructure
Design
$2,224,230 CJ est. value
Athens, OH 45701

Family Dollar Store / New Marshfield
New Construction, Infrastructure - 8,800 SF
Design
$2,000,000 CJ est. value
New Marshfield, OH 45766

Bikeways - Hockhocking Adena Bikeway
Infrastructure
Bidding
$370,211 CJ est. value
Athens, OH 45701

Granular Activated Carbon Addition Project
Addition, Infrastructure
Bidding
$7,400,000 CJ est. value
Millfield, OH 45761

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Overlay Bridge Deck W/modified Pcc - Elbys Br O/l
Infrastructure
Post-Bid
$600,000 CJ est. value
Triadelphia, WV 26059

2022 Street Improvements
Infrastructure
Results
$368,333 CJ est. value
Athens, OH 45701

Tank 6 No. Replacement
Demolition, New Construction, Infrastructure
Results
$769,670 CJ est. value
Albany, OH 45710

US Route 33, US Route 50 Interchange Improvement - County of Athens
Infrastructure
Construction
$7,000,000 CJ est. value
Athens, OH 45701

Kershaw Greene Apartments Phases III & IV
New Construction, Infrastructure
Pending Verification
$32,000,000 CJ est. value
Athens, OH 45701

University Estates Medical Office Building
New Construction, Infrastructure - 1,500 SF
Pending Verification
$900,000 CJ est. value
Athens, OH 45701

US 33 - Roadway Minor Rehab
Infrastructure
Design
$5,822,500 CJ est. value
Athens, OH 45701

Golf Carts for Ohio University Golf Course
Term Contract, Infrastructure
Bidding
Athens, OH 45701

Paving Bid
Infrastructure
Post-Bid
$200,000 CJ est. value
Albany, OH 45710

Truetown AMD Site Development Project
Infrastructure
Results
$996,876 CJ est. value
Dover Township, OH 45761

Last Updated 12/18/2023 10:38 AM
Project Title

Sanitary Sewer Improvements - Phase I - Contract A & Contract B

Physical Address View project details and contacts
City, State (County) Chauncey, OH 45761   (Athens County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $6,983,168 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Village of Chauncey; SS (Bid Opening 9/14/23) Contract A - Mendon Pipeline $6,804,168.00 / Contract B - Ohio-West Virginia Excavating $179,000.00 The Owner reserves the right to reject any and all bids, and the right to accept the lowest and best bid, the right to waiver minor irregularities on any bid, and the right to accept the bid proposal which promotes the best interest of the Owner. Federal Prevailing Wage Rates and Equal Employment Opportunity requirements are applicable to this project. If any person, contemplating submitting a Bid for the proposed Project, is in doubt as to the true meaning of any part of the Contract Documents, they may submit to the Engineer, a written request for an interpretation thereof. Requests for interpretation shall be used for discrepancies, errors, clarifications, unspecified product substitutions, or other questions pertaining to the contract documents and drawings in relation to bidding issues. Non-written responses of any nature will not be considered valid in relation to bidding issues. Send requests to: DLZ Ohio, Inc., 30661 Red Rock Court, Logan, Ohio 43138; O:(740) 380-2828, Monday - Friday 8:00 A.M. - 5:00 P.M. by email: bfuller@dlz.com or by fax (740) 380­ 3535; Attention: Robert A. Fuller P.E. (Bobby) Each bid shall be accompanied by a Bid Guaranty and Contract Bond as required by Section 153.54 of the Ohio Revised Code in an amount equal to the sum of the bid submitted by each contractor. In lieu of posting the bond, a bidder may use a Cashier's Check, Certified Check or Letter of Credit for ten percent of the Contractor's bid as bid security. When a check or letter of credit is used, the bidder shall be required to post a 100 percent Performance Bond and a 100 percent Labor and Material Payment Bond, upon the signing of the contract. The Project work shall consist of furnishing all labor, materials, and equipment in accordance with the contract documents. The estimated construction cost for the base bid of the Contract A is $4,925,000.00 The estimated construction cost for the base bid of the Contract B is $167,500.00 Substantial Completion date for the contract shall be 330 days from date of Notice to Proceed. Final Completion date for the contract shall be 360 davs from date of Notice to Proceed.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents