Similar Projects
Pike Creek Shopping Center Outparcel
Demolition, New Construction, Infrastructure - 10,538 SF
Conception
$5,000,000 CJ est. value
Wilmington, DE 19808

3420 Kirkwood Highway Self Storage
New Construction, Infrastructure - 104,016 SF
Conception
$11,000,000 CJ est. value
Wilmington, DE 19808

The Cascades
New Construction
Design
$4,000,000 est. value
Christiana, DE 19702

Bear Freight Facility - Peoples Park - Lot J
New Construction, Infrastructure - 46,142 SF
Design
$25,000,000 CJ est. value
Bear, DE 19701

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Baylor Women's Correctional Institution - Housing Unit 6 Shower Room Renovations
Addition, Demolition, Renovation, Infrastructure
Bidding
$1,695,500 CJ est. value
New Castle, DE 19720

Biden Storm Water and Curbing Repair
Infrastructure
Post-Bid
New Castle, DE

Paving
Term Contract
Post-Bid
DE

SR299, SR 1 to Catherine Street
Results
DE 19720

Pavement and Rehabilitation, North XV, 2016
Results
Pike Creek, DE

New Bancroft School
Demolition, New Construction, Infrastructure
Construction
$50,000,000 CJ est. value
Wilmington, DE 19801

WuXi AppTec STA Pharmaceutical USA / Middletown
New Construction, Infrastructure - 1,740,000 SF
Construction
$510,000,000 CJ est. value
Middletown, DE 19709

Society Drive Self Storage
New Construction, Infrastructure - 22,500 SF
Pending Verification
$9,720,000 CJ est. value
Claymont, DE 19703

701 Industrial Drive Warehouse Addition
Addition, Demolition, Infrastructure - 55,500 SF
Pending Verification
$2,000,000 CJ est. value
Middletown, DE 19709

Village of Canterbury Apartments Expansion
New Construction, Infrastructure
Conception
$9,000,000 CJ est. value
Newark, DE 19702

Last Updated 12/28/2022 10:06 AM
Project Title

15th and Walnut CSO Separation, Green Infrastructure Installation

Physical Address View project details and contacts
City, State (County) Wilmington, DE 19801   (New Castle County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Bridge, Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $1,314,019 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The 15th & Walnut CSO Separation, Green Infrastructure Installation project includes the construction of Green Infrastructure and park improvement, including: subsurface modular storage units; green infrastructure BMP's; landscaping; site grading; storm sewer piping; manholes and inlets; pedestrian walkways and bridges. This project is funded by the Delaware Water Pollution Control Revolving Loan Fund: therefore, bidders and the successful contractor must comply with the related Program Requirements. Bidders must follow the "Good Faith Efforts" in providing opportunities to Disadvantaged Business Enterprises (DBE) in preparation of their bids and procurement of construction, supplies, and services. This project is subject to State of Delaware Prevailing Wage Rates regulations and the Davis Bacon Wage Rates, whichever is higher. A bid bond in the amount of 10% of the total bid is required to be submitted with the bid on this contract. Bidders must also comply with the President's Executive Order No. 11246 which prohibits discrimination in employment regarding race, creed, color, sex, or national origin The above goals are not a quota and apply to DBE participation only.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Selective Clearing, Grading, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Retaining Walls, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents