Similar Projects
Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Chiller Replacement CBSE Building
Post-Bid
$300,000 to $640,000 est. value
Birmingham, AL 35233

Hawkins Recreation Center Gymnasium HVAC Replacement
Results
Birmingham, AL 35206

Reroofing and HVAC Replacement for Midfield High School
Results
Birmingham, AL

SDB 3rd FL Replace Three Air Handlers
Post-Bid
$300,000 to $350,000 est. value
Birmingham, AL 35233

UAB Spain Wallace AHU - 10 and AHU - 11 Replacement
Results
Birmingham, AL

Evaluate HVAC and Power for Mass Spectrometer, THT
Post-Bid
$50,000 to $80,000 est. value
Birmingham, AL 35233

Customer Service Center HVAC Upgrade
Results
Birmingham, AL

HVAC and Refrigerant Services
Term Contract
Post-Bid
AL

Western Filter Plant New Pump Building HVAC Replacement
Results
Birmingham, AL

MA-ALDOT Statewide HVAC
Term Contract
Post-Bid

JEFCO Gym HVAC Additions to Adamsville, Bryan, Clay, Pleasant Grove and Snow Rogers Elementary Schools
Results
Gardendale, AL 35071

Kitchen Hood Cleaning - Jefferson County School System
Post-Bid
AL

Heating and Air Contractual Service (HVAC)
Results
Birmingham, AL 35233

Central Office Building-HVAC Replacement
Post-Bid
Bessemer, AL 35020

Reported 01/25/2019 12:00 AM
Project Title

Humidity Control - UAB Alys Stephens Dressing Room Area

Physical Address View project details and contacts
City, State (County) Birmingham, AL   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value $125,000 to $150,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description HVAC upgrade project to an existing system. The work primarily involves changing an existing constant volume HVAC system to a low pressure variable air volume system. The work shall involve, but not be limited to, installation of VAV units with hydronic re-heats in the existing main branch duct work, installation of hydronic piping for the VAV re-heats, installation of a variable frequency drive on the existing air handler, installation of ductwork, dampers and grilles, and installation and programming of a Siemens DDC control system. Demolition work shall include, but not be limited to, removal of existing DDC controls and removal of duct sections required for installation of the VAV units. The building will be occupied during the HVAC modifications. Contractors will be required to work in a manner so that the building may remain occupied and contractors shall schedule work so that theater usage, and scheduled performances, are not affected.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents