Similar Projects
Trenton Liquid Natural Gas Manufacturing Facility
New Construction, Infrastructure
Conception
$2,800,000,000 CJ est. value
Trenton, ND 58801

137th Avenue NW Industrial Development
New Construction, Infrastructure
Conception
$3,000,000 CJ est. value
Missouri Ridge, ND 58801

SAFuelsX Sustainable Aviation Production Plant
New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Williston, ND 58801

Bethel Lutheran Nursing and Rehabilitation Center
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Williston, ND 58801

WAWSA - MCWRD Phase 2 Transmission Line
Infrastructure
Bidding
$1,500,000 CJ est. value
Williston, ND 58801

WAWSA - MCWRD Phase 2 Transmission Line
Infrastructure
Bidding
$1,500,000 CJ est. value
Williston, ND 58801

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Northeast Tioga Reconstruction - Phase II
Infrastructure
Results
$3,700,000 est. value
Tioga, ND

Water, Sewer, Storm Sewer, and Street Improvements
Infrastructure
Results
$2,250,000 est. value
Williston, ND

Washington Avenue Shop Condominiums
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Williston, ND 58801

Love's Speedco Tire Center / Williston
New Construction, Infrastructure - 10,953 SF
Bidding
$3,000,000 CJ est. value
Williston, ND 58801

Hawkeye Village Phase II Improvements
Infrastructure
Post-Bid
Williston, ND

Sliver Grading, HMA Overlay, Road Realignment, Pipe Extensions, Pipe Replacement, Subcut
Infrastructure
Results
$13,704,757 CJ est. value
Alamo, ND 58830

2nd Ave Northwest and 13th Avenue West Utility Improvements
Infrastructure
Post-Bid
$270,000 CJ est. value
Williston, ND 58801

Last Updated 07/25/2023 02:43 PM
Project Title

Landfill Cells 1-4 Final Cover Phase 1

Physical Address View project details and contacts
City, State (County) Williston, ND 58801   (Williams County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project involves constructing the final cap for a portion of Cells 1-4 at the City of Williston Landfill (approximately 380,000 Square Feet). The work involves required excavating of source material and constructing an eighteen inch compacted clay liner, placing one foot of general uncompacted clay, and six inches of SPGM. The project will also include installation of required soil stabilization and stormwater BMPs. The project consists of the furnishing of all labor and materials for construction of the roadway grading. The project has a 120-calendar day construction schedule from the construction initiation date. The project must be substantially complete no later than September 16, 2023. The final completion date is September 30, 2023.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents