Similar Projects
Construction of the Chip Seal Program Fiscal Year 2020/2021 and 2021/2022 Project
Bidding
Prescott Valley, AZ

SR 69 Frontage Road Pavement Overlay Project
Bidding
$390,000 est. value
Prescott Valley, AZ

Pavement Preservation
Post-Bid
Cottonwood, AZ 86236

AZ FTFS 104(1) Mingus Mountain
Post-Bid
$400,000 to $1,000,000 est. value
AZ 86326

Page Springs Road Seal Coat
Results
Less than $195,000 est. value
Prescott, AZ

Y--Badger Springs Recreation Site Roads
Results
$150,000 to $250,000 est. value
Black Canyon City, AZ 85324

Road 2 North Paving Improvements Project
Bidding
$800,000 est. value
Chino Valley, AZ

Indefinite Quantity (Idiq) Multiple Award Construction Contract (Macc) For Paving Projects At Various Government Installations Within The Navfac Sw Area Of Responsibility Including But Not Limited To California, Arizona, Nevada, Utah, Colorado, And New Mex
Post-Bid

TOPV IGA Roadway Improvement Projects
Results
Prescott, Prescott Valley, AZ 86314

Design-Build Services for Verde Connect Road, SR 260 to Cornville Road
Post-Bid
Prescott, AZ 86305

System Enhancement-Other Enhancements
Results

Chip Seal Summer FY 2020-2021
Post-Bid
$1,012,400 est. value
Prescott, AZ

Viewpoint Drive Connector
Results
Prescott Valley, AZ 86314

Supply or Supply and Deliver Hot Asphaltic Concrete
Post-Bid
Prescott, AZ

Verde Valley School Road Overlay
Results
$562,200 est. value
Prescott, AZ 96305

Last Updated 01/11/2021 04:12 AM
Project Title

Intersection Improvement

Physical Address View project details and contacts
City, State (County) Chino Valley, AZ   (Yavapai County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project is located in Yavapai County on SR 89 at Road 1 North, within the Town of Chino Valley. The project begins at milepost 327.63 extending north to milepost 327.69 on SR 89, and extends approximately 350 feet east and 300 feet west on Road 1 North. The work consists of minor roadway excavation and embankments; concrete curb, gutter, sidewalk, and sidewalk ramps; placing aggregate base, asphaltic concrete pavement, signing and pavement markings; traffic signal, and other related work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete.
Division 10 - Specialties, Signage.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Roadway Signaling and Control Equipment, Traffic Signals.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents