Similar Projects
Wolfs Crossing Road Reconstruction -Segment 2 - Douglas - Village of Oswego
Infrastructure
Conception
$5,201,300 est. value
Oswego, IL 60543

Wolfs Crossing Road Reconstruction-Segment 3 - Roth Road - Village of Oswego
Alteration
Conception
$6,101,000 est. value
Oswego, IL 60543

Lake Michigan Water System
Infrastructure
Design
$592,000,000 to $810,000,000 est. value
Joliet, IL

Milling and Resurfacing
Infrastructure
Bidding
$4,000,000 est. value
Yorkville, IL 60560

Milling and Resurfacing (Designed Overlay) and ADA
Infrastructure
Bidding
$4,000,000 est. value
Plano, IL 60545

Mill Road Reconstruction
Post-Bid
Yorkville, IL

Oakwood Cemetery Lane Improvements
Post-Bid
Joliet, IL

South Madison Street Water Main Replacement
Results
Oswego, IL 60543

2021 MFT and Infrastructure Road Program
Results
Less than $2,965,600 est. value

Resurface Bristol Ridge Road
Infrastructure
Bidding
$4,000,000 est. value
Bristol, IL 60512

Elizabeth Street and Appletree Court Water Main Improvements
Post-Bid
Yorkville, IL 60560

2021 Road Program
Results
Yorkville, IL

2021 Bituminous Patching Materials
Post-Bid
Joliet, IL

Variable Width Pavement W/Hot-Mix Asphalt
Results
Joliet, IL

2021 On-Call Lead Water Service Line Replacement
Term Contract
Post-Bid
Joliet, IL

Reported 06/15/2022 01:48 PM
Project Title

Water Main Replacement Van Buren, South Adams - Village Of Oswego

Physical Address View project details and contacts
City, State (County) Oswego, IL   (Kendall County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Water Lines
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected January 2024
Bids Due View project details and contacts
Estimated Value $1,581,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Water Main Replacement project, install new ductile iron pipe size 6" to 8". W. Van Buren St. from Adams to Main Streets (325 feet) and Adams St. from W. Van Buren St. around Wilson Pl. to Main St. (1,400 feet). Resurfacing of the streets will be included in this project. As of June 14, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents