Similar Projects
Last Updated | 10/27/2021 03:11 AM |
Project Title | FM 529 Phase 2 Improvements |
Physical Address | View project details and contacts |
City, State (County) | Houston, TX 77282 (Harris County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Scope of Project: 1. 265 LF of 24-inch CL III RCP 2. 1 TY AD inlet 3. 1 TY C curb inlet 4. Installation of Highway Signal 5. 3,443 Tons 12-inch HMAC Base 6. 427 Tons 1.5-inch HMAC Surface Level-up 7. 1,607 Tons 1.5-inch HMAC Surface Overlay 8. 121 SY of 10" CRCP 9. 140 SY of 6" CTB 10. 2 Tons Lime 11. Traffic Control 12. Pavement Markings 13. Site Preparations 14. Storm Water Pollution Control. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |