Similar Projects
Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Auburn Lake Trails Paving Projects
Infrastructure
Bidding
$2,000,000 est. value
Cool, CA 95614

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Place Polyester Concrete Overlay
Infrastructure
Post-Bid
$1,650,000 est. value
CA

Roadway Excavation Place Hot Mix Asphalt and Plastic Pipe
Infrastructure
Results
$870,000 est. value
CA

Hot Mix Asphalt (Hma) Concrete Grinder Dig Out Repair and Replacement Paving
Infrastructure
Results
Placerville, CA

Asphalt Patch Paving
Term Contract
Post-Bid
Placerville, CA

Clean Culverts, Install Cured-in Place-Pipeliners and Invert Paving
Infrastructure
Results
$6,700,000 est. value
CA

Asphalt Patching Services
Infrastructure
Post-Bid
$500,000 est. value
South Lake Tahoe, CA

Roadway Excavation and Install Concrete Drainage Inlet
Infrastructure
Results
$850,000 est. value
CA

Pavement Replacement
Infrastructure
Post-Bid
$280,000 est. value

Bell Avenue Complete Street Rehabilitation Project
Infrastructure
Results
$4,163,870 est. value

As-Needed Road Surface Treatment Services
Infrastructure
Post-Bid
CA

Tahoe Valley Stormwater and Greenbelt Improvement Project, Phase 1
Infrastructure
Results
$7,250,000 to $7,500,000 est. value
South Lake Tahoe, CA

2022 Road Work Project
Infrastructure
Post-Bid
$250,000 est. value
CA

Reported 06/14/2022 02:48 PM
Project Title

Cameron Park Drive Widening - Palmer Drive to Sudbury - 72143 - El Dorado County

Physical Address View project details and contacts
City, State (County) Cameron Park, CA 95682   (El Dorado County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value $6,047,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Widen Cameron Park Drive two-lane undivided roadway to a four-lane divided roadway, from Palmer Drive to Sudbury. Improvements include curb, gutter and sidewalk. Curb, gutter and sidewalk are not TIM Fee funded. As of June 13, 2022,, this project is included in the El Dorado County's FY 2020-2040 CIP. Bidding documents, design team or contractor selection has not been released. Although a firm timeline for construction has not been determined, construction is not expected to start prior to FY 2022-2023 *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents