Similar Projects
Fire Department Dispatch Console Replacement
Post-Bid
Madison, WI 53704

Immediate Need Fiber Projects
Post-Bid
Madison, WI 53703

Building Automation System (BAS) Installation & Maintenance Enterprise-wide Services
Results

Building Automation System (BAS) Installation & Maintenance Enterprise-wide Services
Results

2020 Fire Station Alerting System Installation
Post-Bid
Franklin, WI 53132

Inmate Telephone, Video Visitation, Inmate Information Kiosk System
Term Contract
Results
Menomonie, WI 54751

Fall 2020 Fiber Builds
Post-Bid
Wausau, WI 54403

Door Control System Replacement
Results
Less than $135,000 est. value
Glendale, WI 53212

Commercial Internet Service for 115th Fighter Wing
Post-Bid
Madison, WI 53704

Fiber Optic Cabling at Bay Beach Wildlife Sanctuary
Results
Green Bay, WI 54302

Milwaukee Fire Life Safety CMc
Post-Bid
$8,000,000 to $10,000,000 est. value
Milwaukee, WI 53202

Horlick Field Exterior Sound System
Results
Racine, WI 53404

Integrated Electronic Security System (ESS)
Post-Bid
Madison, WI

Oak 4K Learning Center Connection
Results
Green Bay, WI 54302

Water Utility SCADA System Radios Upgrade
Post-Bid
West Bend, WI 53095

Last Updated 10/13/2020 04:06 AM
Project Title

BCCAN Jail M Pod Expansion

Physical Address View project details and contacts
City, State (County) Green Bay, WI 54311   (Brown County)
Category(s) Single Trades
Sub-Category(s) Security/Communications
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project 2391 includes all necessary labor and materials to: 1) place new single 2” duct (1,695’) on the Brown County property and within the City of Green Bay Gershwin Dr South Right of Way. Place a new 4 – 2” duct pack across the Jail East Drive located at 3030 Curry Lane between an existing handhole and a new handhole. Along with the duct placement the contractor will be required to install approximately 565’ of new 24 strand fiber optic cable within the new duct and existing 2” ducts that currently contain 2 fiber optic cables and pull rope. All cable splicing and termination will be performed by the County’s splicing contractor under an existing contract.

Details

Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents