Similar Projects
Swale and Culvert Work
Alteration
Post-Bid
Saint Peters, MO 63376

Plastic Pipe Liner, HDPE Pipe, and Polypropylene
Infrastructure
Post-Bid
Saint Charles, MO

Sidewalk and Drainage Improvements
Infrastructure
Results
Saint Charles, MO

Laura Drive Drainage Improvements
Infrastructure
Results
$320,000 est. value
O Fallon, MO

North Cool Springs Precast Box
Infrastructure
Post-Bid
O'Fallon, MO 63366

2021 Bank Stabilization & Navigation Project (Bsnp) Structures Repair
Term Contract
Results

Central School Road and St. Peters- Howell Road Traffic Flow Improvements
Infrastructure
Post-Bid
Saint Peters, MO 63376

Crystal Springs Creek Bank Stabilization Project
Infrastructure
Results
Saint Charles, MO

370 Lakeside Park 2nd Entrance Embankment
New Construction
Results
Less than $75,000 est. value
Saint Peters, MO 63376

36 Sanitite Hp Triple Wall Pipe
Infrastructure
Results
O Fallon, MO

Willott Road Culvert at West Branch of Spencer Creek
Infrastructure
Results
Saint Peters, MO 63376

Geotextile Material
Infrastructure
Results
Ballwin, Beaufort, Bella Villa, Cedar Hill, Country Club Hills, Creve Coeur, Crystal Lake Park, Eureka, Festus, Normandy, Pacific, Saint Charles, Saint Clair, Saint Louis, Sappington, Wentzville, MO 63141

Corrugated Metal Pipe
Infrastructure
Results
Josephville, Saint Charles, Saint Peters, Wentzville, MO 63385

Zumbehl Road Culvert Replacement Over Cole Creek
Infrastructure
Results
Saint Charles, MO 63303

Creek Corridor Stewardship Maintenance
Infrastructure
Results
Saint Peters, MO

Last Updated 05/04/2022 02:47 AM
Project Title

Maintenance Culvert Replacement

Physical Address View project details and contacts
City, State (County) Weldon Spring, MO 63304   (Saint Charles County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Existing 100-foot-long 60-inch diameter corrugated metal pipe has failed on Wolfrum Road, approximately 1,300 feet south of Patriotic Trail, 0.75 miles north of the Missouri Research Park Circle at I-64. (See Exhibit A) The City is requesting lump sum bids to replace the 100-foot-long pipe with a 60 -inch diameter polypropylene pipe, reconstruct the failed embankment, reconstruct the pavement, traffic control, and restoration of the disturbed areas.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents