Similar Projects
Panera Bread / Roseville
New Construction, Infrastructure - 4,150 SF
Conception
$1,300,000 CJ est. value
Roseville, MN 55113

Panera Bread / Roseville
New Construction, Infrastructure - 4,150 SF
Conception
$1,300,000 CJ est. value
Roseville, MN 55113

Pool 2 Wing Dam Notching
Infrastructure
Design
$500,000 CJ est. value
Saint Paul, MN 55101

Pool 2 Wing Dam Notching
Infrastructure
Design
$500,000 CJ est. value
Saint Paul, MN 55101

Public Safety Addition and Renovation
Addition, Demolition, Renovation, Infrastructure
Sub-Bidding
$11,100,000 CJ est. value
White Bear Lake, MN 55110

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Site 1408-1410 Paving
Renovation
Post-Bid
Saint Paul, MN 55117

Grading, Bituminous Surfacing, Signing, TMS, and Lighting
Results

Old Highway 8 Intersection Improvements
Results
$2,000,000 est. value
New Brighton, MN 55112

Twin Lakes Station Demolition and Sitework
Demolition, Infrastructure
Construction
Roseville, MN 55113

Jie Mandarin Immersion Addition and Renovation - Part 2 Bid Package #2
New Construction, Infrastructure - 20,000 SF
Construction
$1,298,790 CJ est. value
Saint Paul, MN 55116

Riversedge - Phase 2
New Construction, Infrastructure
Pending Verification
$220,000,000 CJ est. value
Saint Paul, MN 55102

Deluxe Campus Redevelopment
Demolition, New Construction, Infrastructure, Renovation
Pending Verification
$300,000,000 CJ est. value
Shoreview, MN 55126

Ramp Reconstruction, Resurfacing, Drainage, Signal and ADA Improvements - TH 36
Alteration
Conception
$1,800,000 est. value
Roseville, MN 55112

Spring Break - 80-Themed Restaurant and Bar / St. Paul
New Construction, Infrastructure
Design
$935,000 CJ est. value
Saint Paul, MN 55101

Last Updated 09/21/2022 08:40 AM
Project Title

RFQ D/B - MWWTP Services Buildings and Site Improvements Project - Step 1

Physical Address View project details and contacts
City, State (County) Saint Paul, MN 55101   (Ramsey County)
Category(s) Heavy and Highway, Laboratory
Sub-Category(s) Dam/Tunnel, Laboratory, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Request for Qualifications, Construction start expected December 2021 , Construction documents
Bids Due View project details and contacts
Estimated Value $805,990 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Question Due Date: April 1, 2021 The Metropolitan Council is soliciting a Design-Builder to design and construct the following at the Metropolitan Wastewater Treatment Plant in Saint Paul, Minnesota: o Services and Field Service Annex buildings adjacent to the Analytical Laboratory Building o Analytical Laboratory Building improvements o Tunnel from the Field Service Annex to either the existing East Primary or East Pretreatment tunnel o Security Guard House building o North Parking Lot and other site improvements The Council is using a two-step solicitation process to select the Design-Builder. In the first step, the Council will issue a Request for Qualifications (RFQ). In the second step, the Council will issue a Request for Proposals (RFP) to firms shortlisted in the RFQ process. Both the RFQ and RFP are part of the same procurement process. All interested parties are invited to respond to this RFQ with a Statements of Qualifications (SOQ). The Council will evaluate Respondents SOQs according to the criteria in this RFQ. This project is located at the Metropolitan Wastewater Treatment Plant (Metro Plant) in St. Paul, MN. The Metro Plant is a 250 MGD advanced municipal wastewater treatment facility located along the Mississippi River at the terminus of Childs Road. The Metro Plant has approximately 150 operations and maintenance personnel on site during normal weekday business hours, receives up to 30 deliveries per day and is also the destination for approximately 70 trucks bringing liquid waste to the plant. This project will include construction of a 27,000 square foot Services building and an 18,000 square foot Field Service Annex Building, both adjacent to the existing Laboratory building, and other improvements outlined in the Project Scope below. The existing Laboratory building is a modern 24,000 square foot facility constructed in 2002. Construction of this project will facilitate consolidation of Council staff from multiple locations to improve workflow efficiency and to provide state of the art analytical facilities. With its responsibility to promote sustainability best practices across the region, the Council has committed to enroll this project in the B3 SB 2030 program, complying with the associated sustainability goals. Total Project Cost - $9,653,878

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings, Doors and Frames, Windows, Vents.
Division 09 - Finishes, Tiling, Flooring, Resilient Flooring, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Institutional Furniture, Laboratory Furniture.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Fans, Central HVAC Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Earthwork Methods, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents