Similar Projects
CHRL Pump Station 1A, 2 and 3
Infrastructure
Design
$750,000 est. value
WA

Above Ground Storage Tank Internal Inspection
Term Contract
Bidding
Yakima, WA 98901

Hanford Integrated Tank Disposition Contract
Alteration
Bidding
WA

Hanford Integrated Tank Disposition Contract
Alteration
Bidding
WA

Mcmillin Reservoir Onsite Septic System Holding Tank Construction for Comfort Station
Infrastructure
Results
WA 98374

Actuator Replacement Project Fabrication
Alteration
Bidding
Richland, WA

Oil Water Separators Maintenance Contract
Infrastructure
Post-Bid
Tacoma, WA 98433

Condensate Pump 1 Alpha Refurbishment
Alteration
Bidding
Richland, WA

Tapteal 1 Pump Station Upgrade
Infrastructure
Post-Bid
Richland, WA 99352

Gooseberry Point Wastewater Treatment Plant Improvements
New Construction, Renovation, Infrastructure
Results
$13,000,000 to $14,500,000 est. value
Bellingham, WA 98226

Furnish and Install 60HP Input Pump Motor
Infrastructure
Bidding
Ridgefield, WA 98642

Kayak Well Rehabilitation
Infrastructure
Bidding
$90,000 est. value
Stanwood, WA 98292

Aurora 1160 Series Pump Refurbishment
Alteration
Post-Bid
Keyport, WA 98345

Water Station 5 Reservoirs and Pump Station
Infrastructure
Results
$28,250,000 est. value
Vancouver, WA 98687

Last Updated 11/09/2021 12:39 PM
Project Title

Well No. 6

Physical Address View project details and contacts
City, State (County) College Place, WA 99324   (Walla Walla County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells, Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,189,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed includes: Equipping the recently drilled Well No. 6 with a pump, motor, and wellhouse facility. The wellhouse facility will include a sodium hypochlorite system for water treatment; electrical panels and controls; process automation; permanent backup power supply and appurtenant site improvements.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents