Last Updated | 09/20/2021 04:49 AM |
Project Title | Prentice - Park Falls, Flambeau River Bridges, B-50-21 and 22; C. Phillips, Lake Street, Elk River Bridge, B-50-19; Hawkins - Bradley, Wisconsin Central RR |
Physical Address | View project details and contacts |
City, State (County) | Park Falls, Prentice, WI (Price County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Excavation Common, 2,083 CY; Base Aggregate Dense, 3,562 Ton; Concrete Pavement, 438 SY; Concrete Masonry Bridges, 15 CY; Concrete Masonry Overlay, 374 CY; Bar Steel Reinforcement Coated, 4,810 Lbs; Marking Epoxy, 10,893 LF; Construction Staking, 2,560 LF; Construction Staking, 4 Each; Construction Staking, 2 LS; Culvert Pipe, 42 LF 12”; Storm Sewer Pipe, 12 LF 12“; Concrete Curb and Gutter, 216 LF; Beam Guard, 775 LF; Beam Guard Energy Absorbing Terminals, 7 Each; Asphaltic Surface, 1,108 Ton; Removing Asphaltic Surface Milling, 2,490 SY; Tack Coat, 332 Gals; Preparation Decks, 356 SY; Concrete Surface Repair, 678 SF; Polymer Overlay, 700 SY; Temporary Traffic Signals, 4 LS. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |