Similar Projects
Proposed Soccer Complex
Infrastructure
Design
$300,000 CJ est. value
Aviston, IL 62216

Proposed Soccer Complex
Infrastructure
Design
$300,000 CJ est. value
Aviston, IL 62216

Bridge Joint Repair and Replacement - IL 127
Infrastructure
Bidding
$2,000,000 CJ est. value
Carlyle, IL 62231

Pumping Station Improvements
Infrastructure
Bidding
$200,000 CJ est. value
Trenton, IL 62293

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Replace Waterline - General
Infrastructure
Results
Less than $100,000 est. value
Centralia, IL 62801

Replace Waterline - Plumbing
Infrastructure
Results
Less than $400,000 est. value
Centralia, IL 62801

2022 High School Partial Pavement Replacement
Infrastructure
Construction
$31,450 CJ est. value
Trenton, IL 62293

Watermain Replacement
Infrastructure
Pending Verification
New Memphis, IL 62215

Watermain Replacement
Infrastructure
Pending Verification
New Memphis, IL 62215

Pavement patching and resurfacing on the ramp between US 50 and St. Rose Road
Infrastructure
Bidding
$600,000 CJ est. value
Carlyle, IL 62231

Box Culvert Replacement on US 50
Infrastructure
Post-Bid
$400,000 CJ est. value
Pearl City, IL 61062

Replace Waterline - Asbestos Abatement
Alteration
Results
Less than $100,000 est. value
Centralia, IL 62801

PCC overlay on I-57
Infrastructure
Bidding
$600,000 CJ est. value
Carlyle, IL 62231

Last Updated 05/23/2023 11:17 AM
Project Title

2-Inch Cast Iron Water Main Replacement

Physical Address View project details and contacts
City, State (County) Bartelso, IL 62218   (Clinton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish all labor, materials, and equipment required to install approximately 2,600 LF of 4" and 6" diameter water main and all appurtenances in various locations throughout the Village. The work shall be completed in accordance with the specifications and drawings covering the work. Although a firm timeline for construction has not been determined, construction is not expected to commence prior to August 2023. All questions shall be directed to John A Wieter at HMG Engineers, Inc. at (618) 577-2240 or jwieter@hmgengineers.com.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents