Similar Projects
Last Updated | 07/05/2023 08:31 AM |
Project Title | Construction of the Highway 105A Project |
Physical Address | View project details and contacts |
City, State (County) | Woodmoor, CO 80132 (El Paso County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $2,000,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Reference Number 0000318430 The proposed Hwy 105A Project consists of widening and full depth reconstruction of Hwy 105, new curb and gutter, two retaining walls, intersection improvements, and new underground drainage system from just east of Jackson Creek Pkwy to Lake Woodmoor Drive, a new roundabout at the Knollwood Drive / Village Ridge Point intersection, and a full spectrum water quality and detention pond. El Paso County is soliciting bids from qualified, experienced, professional Contractors to furnish all materials, labor, and equipment necessary for Construction of the Highway 105A Project, which generally includes widening Hwy 105 from two lanes to four lanes from just east of Jackson Creek Pkwy to Lake Woodmoor Drive with full depth reconstruction of Hwy 105 and associated drainage improvements . PMJM habitat mitigation will be required. The County has acquired the property on the northwest corner of Hwy 105 and Lake Woodmoor Drive, referred to as "the Mitigation Property" for the mitigation. Under no circumstances shall the Contractor or its subcontractors enter the Mitigation Property beyond the limits of disturbance designated in the construction plans. The only exceptions shall be as described in the project special provisions. All work shall be performed within El Paso County right-of-way and easements ("EPC ROW") acquired for the Project. Staging and stockpiles shall be within EPC ROW unless written permission is obtained from property owner(s). Other 05/08/2023 03:00 PM EDT Question Deadline 05/11/2023 at 3:00 PM MT Questions are submitted online Yes |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |