Similar Projects
Elevated Water Storage Tank
Post-Bid
Dallastown, PA 17313

Exterior Tank Painting
Post-Bid
Salisbury, PA

Pocono Auxiliary Water Tank
Results
$2,390,305 est. value
Swiftwater, PA 18370

World-Wide Water Storage Tank Remediation
Term Contract
Results

Water Tank Improvements
Post-Bid
Stewartstown, PA 17363

Leachate Storage Tank Liner Project
Results
Williamsport, PA 17701

Alum Storage Tank at Water Treatment Plant
Post-Bid
Pittsburgh, PA

Y1NE--529-14-101 Demolish Water Tower Design Build
Demolition
Results
$500,000 to $1,000,000 est. value
Meridian, PA 16001

On-Site Sodium Hypochlorite Generation System Maintenance and Repair
Infrastructure
Post-Bid
Phoenixville, PA 19460

2020 Water System Improvements - General Construction
Results
$1,125,000 est. value
Tower City, PA

Water Tank Cleaning, Coating, and Retrofit Project
Infrastructure
Post-Bid
Summit Hill, PA 18250

Clean Out and Remove All Material and Residue from VPI Tank
Results
Less than $25,000 est. value
Philadelphia, PA

2020 Water Storage Tank Project
Infrastructure
Post-Bid
Fleming, PA

Water Treatment Services
Results
Blue Bell, PA 19422

2020 Above Ground Water Storage Tank Project
Infrastructure
Post-Bid
Fleming, PA

Last Updated 06/21/2022 05:28 AM
Project Title

Cedar Crest High School Hot Water Storage Tank Replacement

Physical Address View project details and contacts
City, State (County) Lebanon, PA 17042   (Lebanon County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $70,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Renovation of an educational facility in Lebanon, Pennsylvania. Completed plans call for the renovation of a educational facility. INVITATION TO BID Sealed proposals will be received by the Cornwall-Lebanon School District in Lebanon, Pennsylvania, in conjunction with the Cedar Crest High School Hot Water Storage Tank Replacement. Sealed bids shall be delivered to Jean Hentz at the Educational Service Center at 105 East Evergreen Road, Lebanon PA 17042. Bids will be publicly opened and read at this location by Cornwall-Lebanon School District.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents