Similar Projects
Crescent Harbor Elementary School
New Construction
Conception
$68,000,000 est. value
Oak Harbor, WA 98277

Oak Harbor Elementary School
New Construction
Conception
$75,000,000 est. value
Oak Harbor, WA 98277

Evergreen Public Schools Mill Plain Elementary School Project
New Construction - 61,000 SF
Bidding
$28,000,000 est. value
Vancouver, WA 98684

Mill Plain Elementary Replacement
New Construction - 61,000 SF
Bidding
$28,000,000 est. value
Vancouver, WA 98682

North Queen Anne School
Renovation
Post-Bid
Seattle, WA 98134

District Maintenance Building Improvements
New Construction
Post-Bid
$2,350,000 est. value
Steilacoom, WA

Disaster Recovery Services
Results

Disaster Recovery Services
Results

Sunnyland Elementary School
Renovation, Addition
Pending Verification
Bellingham, WA 98225

Olympic Valley Elementary School
New Construction
Conception
$67,000,000 est. value
Oak Harbor, WA 98277

Chinook Elementary School Secure Entry
Renovation, Alteration - 1,102 SF
Bidding
Vancouver, WA 98687

Montlake Elementary Modernization and Addition Project
Renovation, Addition
Post-Bid
$42,000,000 est. value
Seattle, WA 98112

Fire Alarm Maintenance And Repair Service
Renovation, Alteration
Results
Vancouver, WA 98686

Hand-In-Hand Early Learning Center
New Construction
Conception
$63,800,000 est. value
Oak Harbor, WA 98277

Sherwood Forest Elementary Safety and Security Updates
Renovation, Alteration - 62,638 SF
Bidding
$590,000 est. value
Bellevue, WA 98007

Last Updated 02/08/2022 12:11 PM
Project Title

Alki Elementary Modernization and Replacement Project

Physical Address View project details and contacts
City, State (County) Seattle, WA 98116   (King County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $43,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide preconstruction and construction services for the Alki Elementary Modernization and Replacement project identified in the Building Excellence (BEX) V Capital Levy. The proposed project is located at 3010 59th Avenue SW, Seattle, WA 98116, on a 1.4-acre site. The project will build a new multi-story school addition of approximately 75,000 sq. ft, to the existing Gym/Community Center which will also be renovated to provide permanent space for up to 500 students, grades PreK-5. Students will be located off-site during the period of construction.

Details

Elementary School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents